| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 31.06 | 50 MM DE DIAMERTO | M |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| PINTURA SHERWIN | PINTURA ESMALTE SHERWIN WILLIAMS | LT | 0.068180 | $73.04 | $4.98 |
| THINER | THINER | LTO | 0.033790 | $14.50 | $0.49 |
| ESTOPA | ESTOPA | Kg. | 0.039200 | $25.00 | $0.98 |
| Suma de Material | $6.45 | ||||
| Mano de Obra | |||||
| CUADRILLA NO 11 INST | PINTURA EN TUBERIA TANQUES Y EQUIPOS | JOR | 0.013102 | $437.21 | $5.73 |
| Suma de Mano de Obra | $5.73 | ||||
| Costo Directo | $12.18 |