| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 31.04 | 32 MM DE DIAMETRO | M |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| PINTURA SHERWIN | PINTURA ESMALTE SHERWIN WILLIAMS | LT | 0.046000 | $73.04 | $3.36 |
| THINER | THINER | LTO | 0.022760 | $14.50 | $0.33 |
| ESTOPA | ESTOPA | Kg. | 0.038000 | $25.00 | $0.95 |
| Suma de Material | $4.64 | ||||
| Mano de Obra | |||||
| CUADRILLA NO 11 INST | PINTURA EN TUBERIA TANQUES Y EQUIPOS | JOR | 0.011196 | $437.21 | $4.90 |
| Suma de Mano de Obra | $4.90 | ||||
| Costo Directo | $9.53 |