| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| NCTR-CAR-1-02-003- | CONCRETO EN CABEZALES, DIAFRAGMAS, PANTALLAS, ALEROS, BANCOS Y TOPES | m3 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CONCRETO PRE-05 | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2 | M3 | 1.030000 | $1,245.00 | $1,282.35 |
| CONCRETO PRE-05 | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2 | M3 | 1.030000 | $1,245.00 | $1,282.35 |
| REVENIMIENTO | Revenimiento 14 +/- 3.5 cms | m3 | 1.030000 | $75.00 | $77.25 |
| REVENIMIENTO | Revenimiento 14 +/- 3.5 cms | m3 | 1.030000 | $75.00 | $77.25 |
| CONCRETO PRE-02 | BOMBEO PARA CONCRETO PREMEZCLADO | M3 | 1.030000 | $215.00 | $221.45 |
| CONCRETO PRE-02 | BOMBEO PARA CONCRETO PREMEZCLADO | M3 | 1.030000 | $215.00 | $221.45 |
| Suma de Material | $3,162.10 | ||||
| Mano de Obra | |||||
| CUADRILLA NO. 10 | (1 Of. Albanil + 5 Peones). | Jor | 0.047340 | $2,444.00 | $115.70 |
| CUADRILLA NO. 10 | (1 Of. Albanil + 5 Peones). | Jor | 0.047340 | $2,444.00 | $115.70 |
| Suma de Mano de Obra | $231.40 | ||||
| Equipo | |||||
| MAQUINARIA-23 | VIBRADOR PARA CONCRETO MCA CIPSA CON MOTOR KOHLER 4HP. CONJUNTO CABEZAL DE 14" | Hora | 0.182229 | $9.82 | $1.79 |
| MAQUINARIA-23 | VIBRADOR PARA CONCRETO MCA CIPSA CON MOTOR KOHLER 4HP. CONJUNTO CABEZAL DE 14" | Hora | 0.182229 | $9.82 | $1.79 |
| Suma de Equipo | $3.58 | ||||
| Auxiliar | |||||
| 27C | Cimbra de madera acabado aparente, con descimbrado. Incluye : materiales, mano de obra y herramienta. | m2 | 3.100000 | $208.88 | $647.53 |
| 27C | Cimbra de madera acabado aparente, con descimbrado. Incluye : materiales, mano de obra y herramienta. | m2 | 3.100000 | $208.88 | $647.53 |
| ANDAMIO | ANDAMIO metalicos | DIA | 0.150000 | $62.18 | $9.33 |
| ANDAMIO | ANDAMIO metalicos | DIA | 0.150000 | $62.18 | $9.33 |
| Suma de Auxiliar | $1,313.71 | ||||
| Costo Directo | $4,710.79 |