| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| UV 2505 | GUARNICIÓN DE 0.17X0.15X0.40 M. DE CONCRETO F'C=150 KG/CM2 HECHO EN OBRA, ACABADO APARENTE, INCLUYE: CIMBRADO, DESCIMBRADO, MANO DE OBRA, EQUIPO Y HERRAMIENTA (P.U.O.T.). | ML |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| AGREGADO-003 | AGUA | M3 | 0.020000 | $30.00 | $0.60 |
| CIMBRA METALICA | CIMBRA METALICA(CANAL MONTEN) | ML | 1.000000 | $8.00 | $8.00 |
| ACERO REF. #6 | ACERO DE REFUERZO DE 3/4" #6 f`y = 4200 kg/ml | KG | 0.650000 | $8.09 | $5.26 |
| DIESEL | DIESEL | LT | 0.500000 | $5.06 | $2.53 |
| CLAVO (VARIAS MED.) | CLAVO PARA MADERA VARIAS MEDIDAS | KG | 0.100000 | $13.75 | $1.38 |
| Suma de Material | $17.76 | ||||
| Mano de Obra | |||||
| CUAD OC 09 | CUAD. 1 OF. ALBAÑIL + 1 PEON | jor | 0.066667 | $634.95 | $42.33 |
| CUADRILLA 01 | (1 PEON) | jor | 0.036000 | $273.57 | $9.85 |
| Suma de Mano de Obra | $52.18 | ||||
| Auxiliar | |||||
| CONCRETO 150 KG/CM2 | CONCRETO DE F'C= 150KG/CM2 HECHO EN OBRA AGREGADO MAXIMO 3/4. ELABORADO CON CEMENTO CPP-30RS (RESISTENTE A LOS SULFATOS) | M3 | 0.065920 | $908.21 | $59.87 |
| Suma de Auxiliar | $59.87 | ||||
| Costo Directo | $129.81 |