| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | | | | |
| CONCRETO F´C=150 | Concreto Premezclado F´C=150 KG/CM2 | M3 | 0.115000 | $921.40 | $105.96 |
| CONCRETO F´C=150 | Concreto Premezclado F´C=150 KG/CM2 | M3 | 0.115000 | $921.40 | $105.96 |
| CONCRETO F´C=150 | Concreto Premezclado F´C=150 KG/CM2 | M3 | 0.115000 | $921.40 | $105.96 |
| CONCRETO F´C=150 | Concreto Premezclado F´C=150 KG/CM2 | M3 | 0.115000 | $921.40 | $105.96 |
| C4 | Polin 3 1/2 x3 1/2 x8 1/4 | pt | 0.550000 | $10.00 | $5.50 |
| C4 | Polin 3 1/2 x3 1/2 x8 1/4 | pt | 0.550000 | $10.00 | $5.50 |
| C4 | Polin 3 1/2 x3 1/2 x8 1/4 | pt | 0.550000 | $10.00 | $5.50 |
| C4 | Polin 3 1/2 x3 1/2 x8 1/4 | pt | 0.550000 | $10.00 | $5.50 |
| 103247-1035 | Agua | m3 | 0.005000 | $90.00 | $0.45 |
| 103247-1035 | Agua | m3 | 0.005000 | $90.00 | $0.45 |
| 103247-1035 | Agua | m3 | 0.005000 | $90.00 | $0.45 |
| 103247-1035 | Agua | m3 | 0.005000 | $90.00 | $0.45 |
| MALLA2 | Malla electrosoldada 6x6/10-10, rollo de 100m2 | m2 | 1.100000 | $17.24 | $18.96 |
| MALLA2 | Malla electrosoldada 6x6/10-10, rollo de 100m2 | m2 | 1.100000 | $17.24 | $18.96 |
| MALLA2 | Malla electrosoldada 6x6/10-10, rollo de 100m2 | m2 | 1.100000 | $17.24 | $18.96 |
| MALLA2 | Malla electrosoldada 6x6/10-10, rollo de 100m2 | m2 | 1.100000 | $17.24 | $18.96 |
| Suma de Material | | | | $523.50 |
| Mano de Obra | | | | |
| OC-CUA93 | Cuadrilla de albañiles. Incluye : albañil, ayudante, cabo y herramienta. | Jor | 0.067000 | $1,269.73 | $85.07 |
| OC-CUA93 | Cuadrilla de albañiles. Incluye : albañil, ayudante, cabo y herramienta. | Jor | 0.067000 | $1,269.73 | $85.07 |
| OC-CUA93 | Cuadrilla de albañiles. Incluye : albañil, ayudante, cabo y herramienta. | Jor | 0.067000 | $1,269.73 | $85.07 |
| OC-CUA93 | Cuadrilla de albañiles. Incluye : albañil, ayudante, cabo y herramienta. | Jor | 0.067000 | $1,269.73 | $85.07 |
| Suma de Mano de Obra | | | | $340.29 |
| Herramienta | | | | |
| 100200-1000 | Herramienta menor | (%)mo | 0.020000 | $0.00 | $0.00 |
| 100200-1000 | Herramienta menor | (%)mo | 0.020000 | $0.00 | $0.00 |
| 100200-1000 | Herramienta menor | (%)mo | 0.020000 | $0.00 | $0.00 |
| 100200-1000 | Herramienta menor | (%)mo | 0.020000 | $0.00 | $0.00 |
| EQUIPO DE SEGURIDAD | Equipo de Primera Seguridad (Casco, Botas, Guantes, Gafas, Chaleco Preventivo) | (%)mo | 0.080000 | $0.00 | $0.00 |
| EQUIPO DE SEGURIDAD | Equipo de Primera Seguridad (Casco, Botas, Guantes, Gafas, Chaleco Preventivo) | (%)mo | 0.080000 | $0.00 | $0.00 |
| EQUIPO DE SEGURIDAD | Equipo de Primera Seguridad (Casco, Botas, Guantes, Gafas, Chaleco Preventivo) | (%)mo | 0.080000 | $0.00 | $0.00 |
| EQUIPO DE SEGURIDAD | Equipo de Primera Seguridad (Casco, Botas, Guantes, Gafas, Chaleco Preventivo) | (%)mo | 0.080000 | $0.00 | $0.00 |
| Suma de Herramienta | | | | $0.00 |
| Equipo | | | | |
| C990140-3510 | Vibrador de Concreto mot. gasolina 8 hp Kolher flecha 14 cabezal AA48 de 17/8 (45mm). | Hora | 0.050000 | $70.24 | $3.51 |
| C990140-3510 | Vibrador de Concreto mot. gasolina 8 hp Kolher flecha 14 cabezal AA48 de 17/8 (45mm). | Hora | 0.050000 | $70.24 | $3.51 |
| C990140-3510 | Vibrador de Concreto mot. gasolina 8 hp Kolher flecha 14 cabezal AA48 de 17/8 (45mm). | Hora | 0.050000 | $70.24 | $3.51 |
| C990140-3510 | Vibrador de Concreto mot. gasolina 8 hp Kolher flecha 14 cabezal AA48 de 17/8 (45mm). | Hora | 0.050000 | $70.24 | $3.51 |
| Suma de Equipo | | | | $14.05 |
| Costo Directo | | | | $877.84 |