| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | | | | |
| PRUEBA DE CONCRETO | PRUEBA DE LABOTARIO DE CONTROL DE CALIDAD DE CONCRETO. INCLUYE: PRUEBA DE REVENIMEINTO POR HOLLA Y DE RESISTENCIA SEGUN LA NORMA QUE REGIDA. | M3 | 0.220000 | $23.07 | $5.08 |
| Suma de Material | | | | $5.08 |
| Auxiliar | | | | |
| 020224 | CIMBRA APARENTE EN TRABES. INCLUYE: SUMINISTRO, HABILITADO, ARMADO, COLOCACION, ACARREOS INTERNOS, COSTO POR MANO DE OBRA, MATERIALES DE CONSUMO, EQUIPO Y HERRAMIENTA. | m2 | 1.500000 | $209.23 | $313.85 |
| 020319 | HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA RESISTENCIA NORMAL FY=4200 KG/CM2 No. 3 DIAMETRO 3/8" INCLUYE:SUMINISTRO, ACARREOS INTERNOS, HABILITADO,ARMADO Y COLOCACION, ALAMBRE RECOCIDO, COSTO POR MANO DE OBRA, SEPARADOR DE CONCRETO PARA CALZAR ACERO, EQUIPO Y HERRAMIENTA. | ton | 0.002333 | $19,210.06 | $44.82 |
| 020323 | HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA RESISTENCIA NORMAL FY=4200 KG/CM2 No. 5 DIAMETRO 5/8" INCLUYE:SUMINISTRO, ACARREOS INTERNOS, HABILITADO,ARMADO Y COLOCACION, ALAMBRE RECOCIDO, COSTO POR MANO DE OBRA, SEPARADOR DE CONCRETO PARA CALZAR ACERO, EQUIPO Y HERRAMIENTA. | ton | 0.013728 | $18,637.60 | $255.86 |
| 020319 | HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA RESISTENCIA NORMAL FY=4200 KG/CM2 No. 3 DIAMETRO 3/8" INCLUYE:SUMINISTRO, ACARREOS INTERNOS, HABILITADO,ARMADO Y COLOCACION, ALAMBRE RECOCIDO, COSTO POR MANO DE OBRA, SEPARADOR DE CONCRETO PARA CALZAR ACERO, EQUIPO Y HERRAMIENTA. | ton | 0.005292 | $19,210.06 | $101.66 |
| 020508 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL VACIADO CON BOMBA F'C=250 KG/CM2 REVENIMIENTO DE 14 CM AGREGADO MAXIMO 3/4" EN COLUMNAS, TRABES Y MUROS. INCLUYE:SUMINISTRO DE MATERIALES, COSTO POR MANO DE OBRA, EQUIPO Y HERRAMIENTA. | m3 | 0.220000 | $1,418.44 | $312.06 |
| 03-7022 | TORRE DE TRABAJO DE 0.00 A 4.00 MTS. DE ALTURA CON RUEDAS | R/D | 0.285714 | $34.80 | $9.94 |
| 042526 | ELEVACION CON MALACATE DE MADERA PARA CIMBRA A UNA ALTURA DE HASTA 20 M | pt | 7.755000 | $0.19 | $1.47 |
| 042544 | ELEVACION CON MALACATE DE ACERO DE REFUERZO A UNA ALTURA DE HASTA 20 M | ton | 0.021350 | $260.53 | $5.56 |
| Suma de Auxiliar | | | | $1,045.21 |
| Costo Directo | | | | $1,050.29 |