| Clave | Descripci贸n del An谩lisis de Precio Unitario | Unidad |
| OE-07 | SUMINISTRO E INSTALACI脫N DE TRANSICI脫N EN MEDIA TENSI脫N A脡REA-SUBTERRANEA TRIF脕SICA, CON CSP, INCLUYE: CUCHILLA TIPO COP, HERRAMIENTA, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | PZA |
| Clave | Descripci贸n | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| POSTE-PCR-12750 | POSTE OCTAGONAL DE CONCRETO NORMA CFE , CAT. PCR-12750 | PZA | 1.000000 | $5,500.00 | $5,500.00 |
| CONECTOR-ESTRIBO3/0 | CONECTOR ESTRIBO CAL. 3/0 | PZA | 3.000000 | $213.57 | $640.71 |
| CONECTOR-LINEA-VIVA | CONECTOR LINEA VIVA PERICO | PZA | 3.000000 | $120.00 | $360.00 |
| ALAMBCUDESN#4 | ALAMBRE DE COBRE DESNUDO CALIBRE 4 | KG | 0.780000 | $165.00 | $128.70 |
| CORTAC-15KV-100 | CORTACIRCUITO FUSIBLE DE 15 KV , 100 AMP , MARCA IUSA | PZA | 3.000000 | $850.50 | $2,551.50 |
| APARTARRAY12KVP | APARTARRAYO DE HULE DE SILICON POLIMERICO DE 12 KV. | PZA | 3.000000 | $535.75 | $1,607.25 |
| CUCHILLAS MONOP | CUCHILLAS MONOPOLARES DE 600 AMP. | PZA | 3.000000 | $8,243.84 | $24,731.52 |
| CRUCETA C4R. | CRUCETA C4R | PZA | 2.000000 | $549.12 | $1,098.24 |
| ABRAZD UL | ABRAZADERA UL | PZA | 5.000000 | $71.43 | $357.15 |
| TIRENTE H1 | TIRENTE H1 | PZA | 6.000000 | $126.50 | $759.00 |
| BOTA TERMOCONTR | BOTA TERMOCONTRACTIL TIPO EXTERIOR. | PZA | 1.000000 | $387.00 | $387.00 |
| TERMINAL TERM EXT500 | TERMINAL TERMOCONTRACTIL TIPO EXTERIOR PARA CAL 500 MCM | PZA | 3.000000 | $784.66 | $2,353.98 |
| ZAPATA AL 500 MCM | ZAPATA AL 500 MCM | PZA | 3.000000 | $165.55 | $496.65 |
| Suma de Material | $40,971.70 | ||||
| Mano de Obra | |||||
| INS CUAD ALTA T. | CUADRILLA ALTA TENSION | Jor | 7.089090 | $1,743.65 | $12,360.89 |
| Suma de Mano de Obra | $12,360.89 | ||||
| Equipo | |||||
| GRUA-HIAB 5 TON | CAMION GRUA DE TONELADAS CON TORRETA AMBAR DE SE脩ALAMIENTO | HORA | 3.000000 | $190.06 | $570.18 |
| Suma de Equipo | $570.18 | ||||
| Costo Directo | $53,902.77 |