| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| IMPER | Impermeabilizacion de losa BITUFLEX, IMPERMEABILIZANTE EMULSIONADO | m2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| 1650-15 | BITUFLEX, IMPERMEABILIZANTE EMULSIONADO | CUB | 0.288000 | $80.00 | $23.04 |
| 1650-15 | BITUFLEX, IMPERMEABILIZANTE EMULSIONADO | CUB | 0.288000 | $80.00 | $23.04 |
| 1650-15 | BITUFLEX, IMPERMEABILIZANTE EMULSIONADO | CUB | 0.288000 | $80.00 | $23.04 |
| 1650-15 | BITUFLEX, IMPERMEABILIZANTE EMULSIONADO | CUB | 0.288000 | $80.00 | $23.04 |
| 1650-30 | FIELTRO ASFALTICO, ROLLO DE 3.5 M | ROL | 0.034200 | $170.00 | $5.81 |
| 1650-30 | FIELTRO ASFALTICO, ROLLO DE 3.5 M | ROL | 0.034200 | $170.00 | $5.81 |
| 1650-30 | FIELTRO ASFALTICO, ROLLO DE 3.5 M | ROL | 0.034200 | $170.00 | $5.81 |
| 1650-30 | FIELTRO ASFALTICO, ROLLO DE 3.5 M | ROL | 0.034200 | $170.00 | $5.81 |
| 0302-20 | ARENA | M3 | 0.010000 | $47.65 | $0.48 |
| 0302-20 | ARENA | M3 | 0.010000 | $47.65 | $0.48 |
| 0302-20 | ARENA | M3 | 0.010000 | $47.65 | $0.48 |
| 0302-20 | ARENA | M3 | 0.010000 | $47.65 | $0.48 |
| Suma de Material | $117.32 | ||||
| Mano de Obra | |||||
| CUAD OC 02 | CUAD. 1 OP. DE EQUIPO MENOR. | JOR | 0.066667 | $363.12 | $24.21 |
| CUAD OC 02 | CUAD. 1 OP. DE EQUIPO MENOR. | JOR | 0.066667 | $363.12 | $24.21 |
| CUAD OC 02 | CUAD. 1 OP. DE EQUIPO MENOR. | JOR | 0.066667 | $363.12 | $24.21 |
| CUAD OC 02 | CUAD. 1 OP. DE EQUIPO MENOR. | JOR | 0.066667 | $363.12 | $24.21 |
| Suma de Mano de Obra | $96.83 | ||||
| Costo Directo | $214.15 |