| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 3.06 | PLANTILLA DE CONCRETO SIMPLE F'C=100 KG/CM2 DE 5 CM. DE ESPESOR, INCLUYE: CIMBRA PERIMETRAL | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CIMBRAG | MADERA DE PINO DE 3A. EN BARROTE DE 2" X 4" | PT | 0.450000 | $7.50 | $3.38 |
| CIMBRAG | MADERA DE PINO DE 3A. EN BARROTE DE 2" X 4" | PT | 0.450000 | $7.50 | $3.38 |
| AGUA | AGUA | M3 | 0.020000 | $46.00 | $0.92 |
| AGUA | AGUA | M3 | 0.020000 | $46.00 | $0.92 |
| Suma de Material | $8.59 | ||||
| Mano de Obra | |||||
| CUAD OC 09 | CUAD. 1 OF. ALBAÑIL + 1 PEON | jor | 0.045455 | $768.76 | $34.94 |
| CUAD OC 09 | CUAD. 1 OF. ALBAÑIL + 1 PEON | jor | 0.045455 | $768.76 | $34.94 |
| Suma de Mano de Obra | $69.89 | ||||
| Auxiliar | |||||
| CONCRETO F-C=100 H/O | Concreto hecho en obra f'c = 100 kg/cm2agregado max. 3/4" R.N. | M3 | 0.052500 | $867.54 | $45.55 |
| CONCRETO F-C=100 H/O | Concreto hecho en obra f'c = 100 kg/cm2agregado max. 3/4" R.N. | M3 | 0.052500 | $867.54 | $45.55 |
| Suma de Auxiliar | $91.09 | ||||
| Costo Directo | $169.57 |