| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | | | | |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 0.073500 | $874.00 | $64.24 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 0.073500 | $874.00 | $64.24 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 0.073500 | $874.00 | $64.24 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 0.073500 | $874.00 | $64.24 |
| ACERO | VARILLA A. R. FY=4200 KG/CM2. DEL No. 3 AL 12 | kg | 2.340000 | $10.20 | $23.87 |
| ACERO | VARILLA A. R. FY=4200 KG/CM2. DEL No. 3 AL 12 | kg | 2.340000 | $10.20 | $23.87 |
| ACERO | VARILLA A. R. FY=4200 KG/CM2. DEL No. 3 AL 12 | kg | 2.340000 | $10.20 | $23.87 |
| ACERO | VARILLA A. R. FY=4200 KG/CM2. DEL No. 3 AL 12 | kg | 2.340000 | $10.20 | $23.87 |
| ACERO1 | Acero de refuerzo núm. 2 (1/4" ) | KG | 1.900000 | $12.00 | $22.80 |
| ACERO1 | Acero de refuerzo núm. 2 (1/4" ) | KG | 1.900000 | $12.00 | $22.80 |
| ACERO1 | Acero de refuerzo núm. 2 (1/4" ) | KG | 1.900000 | $12.00 | $22.80 |
| ACERO1 | Acero de refuerzo núm. 2 (1/4" ) | KG | 1.900000 | $12.00 | $22.80 |
| PAVIMENTO-06 | MEMBRANA DE CURADO WRMEADOWS | LT | 0.180000 | $14.00 | $2.52 |
| PAVIMENTO-06 | MEMBRANA DE CURADO WRMEADOWS | LT | 0.180000 | $14.00 | $2.52 |
| PAVIMENTO-06 | MEMBRANA DE CURADO WRMEADOWS | LT | 0.180000 | $14.00 | $2.52 |
| PAVIMENTO-06 | MEMBRANA DE CURADO WRMEADOWS | LT | 0.180000 | $14.00 | $2.52 |
| CIMBRA-03 | DESMOLDANTE SEPAROL DE SIKA | LT | 0.200000 | $17.50 | $3.50 |
| CIMBRA-03 | DESMOLDANTE SEPAROL DE SIKA | LT | 0.200000 | $17.50 | $3.50 |
| CIMBRA-03 | DESMOLDANTE SEPAROL DE SIKA | LT | 0.200000 | $17.50 | $3.50 |
| CIMBRA-03 | DESMOLDANTE SEPAROL DE SIKA | LT | 0.200000 | $17.50 | $3.50 |
| CELOTEX | JUNTA CONSTRUCTIVA DE CELOTEX | M2 | 0.028000 | $97.00 | $2.72 |
| CELOTEX | JUNTA CONSTRUCTIVA DE CELOTEX | M2 | 0.028000 | $97.00 | $2.72 |
| CELOTEX | JUNTA CONSTRUCTIVA DE CELOTEX | M2 | 0.028000 | $97.00 | $2.72 |
| CELOTEX | JUNTA CONSTRUCTIVA DE CELOTEX | M2 | 0.028000 | $97.00 | $2.72 |
| Suma de Material | | | | $478.57 |
| Mano de Obra | | | | |
| CUAD OC 02 | CUAD. 1 OP. DE EQUIPO MENOR. | JOR | 0.100000 | $363.12 | $36.31 |
| CUAD OC 02 | CUAD. 1 OP. DE EQUIPO MENOR. | JOR | 0.100000 | $363.12 | $36.31 |
| CUAD OC 02 | CUAD. 1 OP. DE EQUIPO MENOR. | JOR | 0.100000 | $363.12 | $36.31 |
| CUAD OC 02 | CUAD. 1 OP. DE EQUIPO MENOR. | JOR | 0.100000 | $363.12 | $36.31 |
| Suma de Mano de Obra | | | | $145.25 |
| Auxiliar | | | | |
| BAS -CIMMET | CIMBRA METALICA DE 40 CMS DE ALTURA | ml | 0.050000 | $419.25 | $20.96 |
| BAS -CIMMET | CIMBRA METALICA DE 40 CMS DE ALTURA | ml | 0.050000 | $419.25 | $20.96 |
| BAS -CIMMET | CIMBRA METALICA DE 40 CMS DE ALTURA | ml | 0.050000 | $419.25 | $20.96 |
| BAS -CIMMET | CIMBRA METALICA DE 40 CMS DE ALTURA | ml | 0.050000 | $419.25 | $20.96 |
| Suma de Auxiliar | | | | $83.85 |
| Costo Directo | | | | $707.67 |