| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | | | | |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 1.050000 | $874.00 | $917.70 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 1.050000 | $874.00 | $917.70 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 1.050000 | $874.00 | $917.70 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 1.050000 | $874.00 | $917.70 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 1.050000 | $874.00 | $917.70 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 1.050000 | $874.00 | $917.70 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 1.050000 | $874.00 | $917.70 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 1.050000 | $874.00 | $917.70 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 1.050000 | $874.00 | $917.70 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 1.050000 | $874.00 | $917.70 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 1.050000 | $874.00 | $917.70 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 1.050000 | $874.00 | $917.70 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 1.050000 | $874.00 | $917.70 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 1.050000 | $874.00 | $917.70 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 1.050000 | $874.00 | $917.70 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 1.050000 | $874.00 | $917.70 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 1.050000 | $874.00 | $917.70 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 1.050000 | $874.00 | $917.70 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 1.050000 | $874.00 | $917.70 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 1.050000 | $874.00 | $917.70 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 1.050000 | $874.00 | $917.70 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 1.050000 | $874.00 | $917.70 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 1.050000 | $874.00 | $917.70 |
| CONC.PREMEZ.F-C 250 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL F'C = 250 KG/CM2, T.M.A. 3/4", INCL REVENIMIENTO | M3 | 1.050000 | $874.00 | $917.70 |
| BOMBEO CONCRETO | BOMBEO DE CONCRETO | M3 | 1.050000 | $147.25 | $154.61 |
| BOMBEO CONCRETO | BOMBEO DE CONCRETO | M3 | 1.050000 | $147.25 | $154.61 |
| BOMBEO CONCRETO | BOMBEO DE CONCRETO | M3 | 1.050000 | $147.25 | $154.61 |
| BOMBEO CONCRETO | BOMBEO DE CONCRETO | M3 | 1.050000 | $147.25 | $154.61 |
| BOMBEO CONCRETO | BOMBEO DE CONCRETO | M3 | 1.050000 | $147.25 | $154.61 |
| BOMBEO CONCRETO | BOMBEO DE CONCRETO | M3 | 1.050000 | $147.25 | $154.61 |
| BOMBEO CONCRETO | BOMBEO DE CONCRETO | M3 | 1.050000 | $147.25 | $154.61 |
| BOMBEO CONCRETO | BOMBEO DE CONCRETO | M3 | 1.050000 | $147.25 | $154.61 |
| BOMBEO CONCRETO | BOMBEO DE CONCRETO | M3 | 1.050000 | $147.25 | $154.61 |
| BOMBEO CONCRETO | BOMBEO DE CONCRETO | M3 | 1.050000 | $147.25 | $154.61 |
| BOMBEO CONCRETO | BOMBEO DE CONCRETO | M3 | 1.050000 | $147.25 | $154.61 |
| BOMBEO CONCRETO | BOMBEO DE CONCRETO | M3 | 1.050000 | $147.25 | $154.61 |
| BOMBEO CONCRETO | BOMBEO DE CONCRETO | M3 | 1.050000 | $147.25 | $154.61 |
| BOMBEO CONCRETO | BOMBEO DE CONCRETO | M3 | 1.050000 | $147.25 | $154.61 |
| BOMBEO CONCRETO | BOMBEO DE CONCRETO | M3 | 1.050000 | $147.25 | $154.61 |
| BOMBEO CONCRETO | BOMBEO DE CONCRETO | M3 | 1.050000 | $147.25 | $154.61 |
| BOMBEO CONCRETO | BOMBEO DE CONCRETO | M3 | 1.050000 | $147.25 | $154.61 |
| BOMBEO CONCRETO | BOMBEO DE CONCRETO | M3 | 1.050000 | $147.25 | $154.61 |
| BOMBEO CONCRETO | BOMBEO DE CONCRETO | M3 | 1.050000 | $147.25 | $154.61 |
| BOMBEO CONCRETO | BOMBEO DE CONCRETO | M3 | 1.050000 | $147.25 | $154.61 |
| BOMBEO CONCRETO | BOMBEO DE CONCRETO | M3 | 1.050000 | $147.25 | $154.61 |
| BOMBEO CONCRETO | BOMBEO DE CONCRETO | M3 | 1.050000 | $147.25 | $154.61 |
| BOMBEO CONCRETO | BOMBEO DE CONCRETO | M3 | 1.050000 | $147.25 | $154.61 |
| BOMBEO CONCRETO | BOMBEO DE CONCRETO | M3 | 1.050000 | $147.25 | $154.61 |
| AGUA | AGUA | M3 | 0.095000 | $46.00 | $4.37 |
| AGUA | AGUA | M3 | 0.095000 | $46.00 | $4.37 |
| AGUA | AGUA | M3 | 0.095000 | $46.00 | $4.37 |
| AGUA | AGUA | M3 | 0.095000 | $46.00 | $4.37 |
| AGUA | AGUA | M3 | 0.095000 | $46.00 | $4.37 |
| AGUA | AGUA | M3 | 0.095000 | $46.00 | $4.37 |
| AGUA | AGUA | M3 | 0.095000 | $46.00 | $4.37 |
| AGUA | AGUA | M3 | 0.095000 | $46.00 | $4.37 |
| AGUA | AGUA | M3 | 0.095000 | $46.00 | $4.37 |
| AGUA | AGUA | M3 | 0.095000 | $46.00 | $4.37 |
| AGUA | AGUA | M3 | 0.095000 | $46.00 | $4.37 |
| AGUA | AGUA | M3 | 0.095000 | $46.00 | $4.37 |
| AGUA | AGUA | M3 | 0.095000 | $46.00 | $4.37 |
| AGUA | AGUA | M3 | 0.095000 | $46.00 | $4.37 |
| AGUA | AGUA | M3 | 0.095000 | $46.00 | $4.37 |
| AGUA | AGUA | M3 | 0.095000 | $46.00 | $4.37 |
| AGUA | AGUA | M3 | 0.095000 | $46.00 | $4.37 |
| AGUA | AGUA | M3 | 0.095000 | $46.00 | $4.37 |
| AGUA | AGUA | M3 | 0.095000 | $46.00 | $4.37 |
| AGUA | AGUA | M3 | 0.095000 | $46.00 | $4.37 |
| AGUA | AGUA | M3 | 0.095000 | $46.00 | $4.37 |
| AGUA | AGUA | M3 | 0.095000 | $46.00 | $4.37 |
| AGUA | AGUA | M3 | 0.095000 | $46.00 | $4.37 |
| AGUA | AGUA | M3 | 0.095000 | $46.00 | $4.37 |
| Suma de Material | | | | $25,840.38 |
| Mano de Obra | | | | |
| CUAD OC 05 | CUAD. 1 ALBAÑIL + 5 PEONES | jor | 0.050000 | $1,989.44 | $99.47 |
| CUAD OC 05 | CUAD. 1 ALBAÑIL + 5 PEONES | jor | 0.050000 | $1,989.44 | $99.47 |
| CUAD OC 05 | CUAD. 1 ALBAÑIL + 5 PEONES | jor | 0.050000 | $1,989.44 | $99.47 |
| CUAD OC 05 | CUAD. 1 ALBAÑIL + 5 PEONES | jor | 0.050000 | $1,989.44 | $99.47 |
| CUAD OC 05 | CUAD. 1 ALBAÑIL + 5 PEONES | jor | 0.050000 | $1,989.44 | $99.47 |
| CUAD OC 05 | CUAD. 1 ALBAÑIL + 5 PEONES | jor | 0.050000 | $1,989.44 | $99.47 |
| CUAD OC 05 | CUAD. 1 ALBAÑIL + 5 PEONES | jor | 0.050000 | $1,989.44 | $99.47 |
| CUAD OC 05 | CUAD. 1 ALBAÑIL + 5 PEONES | jor | 0.050000 | $1,989.44 | $99.47 |
| CUAD OC 05 | CUAD. 1 ALBAÑIL + 5 PEONES | jor | 0.050000 | $1,989.44 | $99.47 |
| CUAD OC 05 | CUAD. 1 ALBAÑIL + 5 PEONES | jor | 0.050000 | $1,989.44 | $99.47 |
| CUAD OC 05 | CUAD. 1 ALBAÑIL + 5 PEONES | jor | 0.050000 | $1,989.44 | $99.47 |
| CUAD OC 05 | CUAD. 1 ALBAÑIL + 5 PEONES | jor | 0.050000 | $1,989.44 | $99.47 |
| CUAD OC 05 | CUAD. 1 ALBAÑIL + 5 PEONES | jor | 0.050000 | $1,989.44 | $99.47 |
| CUAD OC 05 | CUAD. 1 ALBAÑIL + 5 PEONES | jor | 0.050000 | $1,989.44 | $99.47 |
| CUAD OC 05 | CUAD. 1 ALBAÑIL + 5 PEONES | jor | 0.050000 | $1,989.44 | $99.47 |
| CUAD OC 05 | CUAD. 1 ALBAÑIL + 5 PEONES | jor | 0.050000 | $1,989.44 | $99.47 |
| CUAD OC 05 | CUAD. 1 ALBAÑIL + 5 PEONES | jor | 0.050000 | $1,989.44 | $99.47 |
| CUAD OC 05 | CUAD. 1 ALBAÑIL + 5 PEONES | jor | 0.050000 | $1,989.44 | $99.47 |
| CUAD OC 05 | CUAD. 1 ALBAÑIL + 5 PEONES | jor | 0.050000 | $1,989.44 | $99.47 |
| CUAD OC 05 | CUAD. 1 ALBAÑIL + 5 PEONES | jor | 0.050000 | $1,989.44 | $99.47 |
| CUAD OC 05 | CUAD. 1 ALBAÑIL + 5 PEONES | jor | 0.050000 | $1,989.44 | $99.47 |
| CUAD OC 05 | CUAD. 1 ALBAÑIL + 5 PEONES | jor | 0.050000 | $1,989.44 | $99.47 |
| CUAD OC 05 | CUAD. 1 ALBAÑIL + 5 PEONES | jor | 0.050000 | $1,989.44 | $99.47 |
| CUAD OC 05 | CUAD. 1 ALBAÑIL + 5 PEONES | jor | 0.050000 | $1,989.44 | $99.47 |
| Suma de Mano de Obra | | | | $2,387.33 |
| Equipo | | | | |
| AVIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.200000 | $70.42 | $14.08 |
| AVIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.200000 | $70.42 | $14.08 |
| AVIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.200000 | $70.42 | $14.08 |
| AVIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.200000 | $70.42 | $14.08 |
| AVIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.200000 | $70.42 | $14.08 |
| AVIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.200000 | $70.42 | $14.08 |
| AVIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.200000 | $70.42 | $14.08 |
| AVIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.200000 | $70.42 | $14.08 |
| AVIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.200000 | $70.42 | $14.08 |
| AVIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.200000 | $70.42 | $14.08 |
| AVIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.200000 | $70.42 | $14.08 |
| AVIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.200000 | $70.42 | $14.08 |
| AVIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.200000 | $70.42 | $14.08 |
| AVIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.200000 | $70.42 | $14.08 |
| AVIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.200000 | $70.42 | $14.08 |
| AVIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.200000 | $70.42 | $14.08 |
| AVIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.200000 | $70.42 | $14.08 |
| AVIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.200000 | $70.42 | $14.08 |
| AVIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.200000 | $70.42 | $14.08 |
| AVIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.200000 | $70.42 | $14.08 |
| AVIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.200000 | $70.42 | $14.08 |
| AVIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.200000 | $70.42 | $14.08 |
| AVIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.200000 | $70.42 | $14.08 |
| AVIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.200000 | $70.42 | $14.08 |
| Suma de Equipo | | | | $338.02 |
| Costo Directo | | | | $28,565.72 |