| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 6 | "047-G CONCRETO HIDRAULICO G.11CONCRETO HIDRAULICO, POR UNIDAD DE OBRA TERMINADA (INCISO: 3.01.02.026-H.10): a) SIMPLE, COLADO EN SECO: 2) De F'c=100Kg/cm2 EN SUBESTRUCTURA (EN PLANTILLAS DE ZAPATAS)" | M3 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| PREMEZCLADO FC 100 | premezclado f'c= 100 kg/cm2 | m3 | 1.050000 | $600.00 | $630.00 |
| CIMBRA-04 | MADERA DE PINO | PT | 1.250000 | $5.15 | $6.44 |
| CIMBRA-01 | CIMBRAPLAY | M2 | 0.400000 | $73.76 | $29.50 |
| CIMBRA-02 | CLAVO | Kg. | 0.400000 | $8.77 | $3.51 |
| Suma de Material | $669.45 | ||||
| Mano de Obra | |||||
| CUAD OC 09 | CUAD. 1 OF. ALBAÑIL + 1 PEON | JOR | 0.400000 | $618.40 | $247.36 |
| Suma de Mano de Obra | $247.36 | ||||
| Auxiliar | |||||
| TRAZO | TRAZO Y NIVELACION | HR | 0.075000 | $50.82 | $3.81 |
| Suma de Auxiliar | $3.81 | ||||
| Costo Directo | $920.62 |