| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 08.01.02 | CADENA DE CERRAMIENTO DE 0.20 x 0.20, DE CONCRETO HECHO EN OBRA DE 200 KG/CM2, ARMADO CON 4 VARILLAS DE 3/8", Y ESTRIBOS DE 3/8" A CADA 0.20 M. CIMBRA COMUN, VACIADO, ARMADO, ACARREO Y ELEVACION A 3 M. | ML |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| ACER. VARIOS DIAM | ACERO REF.VAR.DIAM. | KG | 2.550000 | $14.50 | $36.98 |
| M-BARROTE2X4X8PINO3A | BARROTE DE 2" X 4" X 8' PINO DE 3A | PT | 2.800000 | $7.50 | $21.00 |
| DIESEL | DIESEL | LT | 0.250000 | $6.00 | $1.50 |
| ALAMBRE RECOCIDO | Alambre recocido cal. 18 | KG | 0.100000 | $18.00 | $1.80 |
| CLAVO (VARIAS MED.) | Clavo de acero al carbón de 2" a 4" | KG | 0.137480 | $6.00 | $0.82 |
| Suma de Material | $62.10 | ||||
| Mano de Obra | |||||
| CUADRILLA NO. 06 | CUADRILLA NO. 6 (1OFICIAL ALBAÑIL + 1 PEON) | JOR | 0.062500 | $813.73 | $50.86 |
| Suma de Mano de Obra | $50.86 | ||||
| Herramienta | |||||
| ANDAMIO METALICO | Andamio hasta una altura de 6.00 mts. | r/dia | 0.050000 | $48.60 | $2.43 |
| Suma de Herramienta | $2.43 | ||||
| Equipo | |||||
| VIBRADOR P/CONCRETO | Vibrador para concreto Mot. Kohler 4 H.Con operador. | HR | 0.050000 | $18.27 | $0.91 |
| Suma de Equipo | $0.91 | ||||
| Auxiliar | |||||
| CONC.H/OF-C=150RN3/4 | CONCRETO HECHO EN OBRA F'C=150 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 3/4" | M3 | 0.024000 | $653.33 | $15.68 |
| Suma de Auxiliar | $15.68 | ||||
| Costo Directo | $131.98 |