| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| TAPIAL-TUNEL | tapial tunel de proteccion peatonal | m.l. |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| MADERA-3 | MADERA DE PINO DE 3A. | PT | 0.000000 | $7.49 | $0.00 |
| CLAVO | CLAVO | KG | 0.000000 | $13.08 | $0.00 |
| POLÍN 3 1/2 X 3 1/2" | Polín 3 1/2 x 3 1/2" x 8 1/4' | pt | 0.000000 | $5.00 | $0.00 |
| DUELA ECONOMICA 3/4" | Duela Economica 3/4" x 3 1/2" x 8 1/4' | pt | 0.000000 | $4.34 | $0.00 |
| BARROTE 1 1/2" X 3 1 | Barrote 1 1/2" x 3 1/2" x 8 1/4' | pt | 0.000000 | $8.00 | $0.00 |
| LAMINA GALV | lamina galvanizada O- 725 | m2 | 1.250000 | $45.00 | $56.25 |
| Suma de Material | $56.25 | ||||
| Mano de Obra | |||||
| CUADRILLA -04 | (1 OFICIAL CARPINTERO OBRA NEGRA + 1 AYUDANTE) | JOR | 0.000000 | $630.80 | $0.00 |
| Suma de Mano de Obra | $0.00 | ||||
| Costo Directo | $56.25 |