| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| A10-13 | CONSTRUCCION DE MURO CONCRETO F'C=200 KG/CM2 ENTRE BALCONES EN 10 CM. DE ESPESOR, ARMADO CON VARILLA DEL NUM. 3 A CADA 20 CM. EN AMBOS SENTIDOS, INCLUYE: CIMBRADO, ARMADO Y COLADO. | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| AGUA | AGUA | M3 | 0.060000 | $35.00 | $2.10 |
| Suma de Material | $2.10 | ||||
| Mano de Obra | |||||
| CUADRILLA NO. 11 | (1 OFICIAL CARPINTERO DE OBRA NEGRA + 1AYUDANTE) | JOR | 0.369300 | $621.97 | $229.69 |
| CUAD OC 62 | CUAD. 1 FIERRERO + 1 AYUDANTE DE FIERRERO | jor | 0.147800 | $588.58 | $86.99 |
| CUADRILLA NO.06 | (1 OFICIAL ALBAÑIL + 1 PEON) | JOR | 0.077500 | $621.97 | $48.20 |
| Suma de Mano de Obra | $364.89 | ||||
| Auxiliar | |||||
| ACERO REF | ACERO DE REFUERZO VARIOS DIAMETROS | TON | 0.006120 | $14,603.95 | $89.38 |
| CIMBRA DE MADERA | CIMBRA DE MADERA | M2 | 0.183300 | $133.08 | $24.39 |
| CONCRETO F-C=200 H/O | CONCRETO H.O. F'C=200 KG/CM2, R.N. AGR. MAX. 3/4" | M3 | 0.108000 | $964.20 | $104.13 |
| ANDAMIO OC | ANDAMIO METALICO | (%)mo | 0.050000 | $0.00 | $0.00 |
| Suma de Auxiliar | $217.90 | ||||
| Costo Directo | $584.89 |