| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 1.001 | TRAZO Y NIVELACION CON APARATOS TOPOGRAFICOS DEJANDO BANCOS DE NIVEL EN SITIOS DONDE SEA DIFICIL DAÑARLOS A BASE DE MOJONERAS DE CONCRETO CON VARILLAS DE ACERO, INCLUYE: MANO DE OBRA, MATERIALES DE CONSUMO, EQUIPO, HERRAMIENTA,ACARREOS.( P.U.O.T.). | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CALHIDRA | Calhidra | ton | 0.001000 | $920.00 | $0.92 |
| CALHIDRA | Calhidra | ton | 0.001000 | $920.00 | $0.92 |
| PINTURA DE ESMALTE | PINTURA DE ESMALTE COMEX 100 | LT | 0.004000 | $53.81 | $0.22 |
| PINTURA DE ESMALTE | PINTURA DE ESMALTE COMEX 100 | LT | 0.004000 | $53.81 | $0.22 |
| MADERA DE PINO | MADERA PINO 3a. | pt | 0.060000 | $5.61 | $0.34 |
| MADERA DE PINO | MADERA PINO 3a. | pt | 0.060000 | $5.61 | $0.34 |
| Suma de Material | $2.94 | ||||
| Mano de Obra | |||||
| CUADRILLA -22 | (1 TOPOGRAFO + 4 CADENEROS) | JOR | 0.001400 | $1,628.44 | $2.28 |
| CUADRILLA -22 | (1 TOPOGRAFO + 4 CADENEROS) | JOR | 0.001400 | $1,628.44 | $2.28 |
| Suma de Mano de Obra | $4.56 | ||||
| Costo Directo | $7.50 |