| IV.003 | FIRME DE CONCRETO F`C= 250 KG/CM2. PREMEZCLADO DE 15.00 CM. DE ESPESOR ARMADO CON MALLA ELECTROSOLDADA 66-4-4 EN UN LECHO CALZADA CON SILLETAS A BASE DE VARILLA No. 3 @ 50 X 50 CM., ACABADO PULIDO CON ALLANADORA MECANICA EN ESTACIONAMIENTO INCLUYE : CIMBRA CON MADERA O METALICA,SUMINISTRO, EXTENDIDO Y ENDERAZADO DE LA MALLA,SUMINISTRO DE SILLETAS METALICAS CON VARILLA DEL No. 3 @ 50 X 50 CM., HUMEDECER SUPERFICIE ANTES DEL COLADO, EXTENDIDO, VIBRADO, ACARREOS A UNA DISTANCIA MAXIMA DE DOS ESTACIONES, DESPERDICIOS, HERRAMIENTA, EQUIPO, CURADO CON MEMBRANA COLOR ROJO APLICADA CON RODILLO O ASPERSOR. ( P.U.O.T.). | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CONC.PREMEZ.F-C=250 | Concreto Premezclado F'c=250 Kg/cm2 T.M.A. 3/4" revenimiento tiro directo | M3 | 0.154500 | $948.00 | $146.47 |
| CONC.PREMEZ.F-C=250 | Concreto Premezclado F'c=250 Kg/cm2 T.M.A. 3/4" revenimiento tiro directo | M3 | 0.154500 | $948.00 | $146.47 |
| CONC.PREMEZ.F-C=250 | Concreto Premezclado F'c=250 Kg/cm2 T.M.A. 3/4" revenimiento tiro directo | M3 | 0.154500 | $948.00 | $146.47 |
| FIBRA FEST | FIBRA DE POLIPROPILENO PARA CONCRETO | kg | 0.090090 | $71.25 | $6.42 |
| FIBRA FEST | FIBRA DE POLIPROPILENO PARA CONCRETO | kg | 0.090090 | $71.25 | $6.42 |
| FIBRA FEST | FIBRA DE POLIPROPILENO PARA CONCRETO | kg | 0.090090 | $71.25 | $6.42 |
| MEMBRANA DE PARAF. | tela prs plicout | M2 | 0.300000 | $14.25 | $4.28 |
| MEMBRANA DE PARAF. | tela prs plicout | M2 | 0.300000 | $14.25 | $4.28 |
| MEMBRANA DE PARAF. | tela prs plicout | M2 | 0.300000 | $14.25 | $4.28 |
| CIMBRA METALICA | CIMBRA METALICA(CANAL MONTEN) | ML | 0.020000 | $5.23 | $0.10 |
| CIMBRA METALICA | CIMBRA METALICA(CANAL MONTEN) | ML | 0.020000 | $5.23 | $0.10 |
| CIMBRA METALICA | CIMBRA METALICA(CANAL MONTEN) | ML | 0.020000 | $5.23 | $0.10 |
| AGUA | AGUA | M3 | 0.005000 | $40.00 | $0.20 |
| AGUA | AGUA | M3 | 0.005000 | $40.00 | $0.20 |
| AGUA | AGUA | M3 | 0.005000 | $40.00 | $0.20 |
| MALLA 6-6 4/4 | MALLA ELECTROSOLDADA 6/6 4/4 | M2 | 1.050000 | $22.71 | $23.85 |
| MALLA 6-6 4/4 | MALLA ELECTROSOLDADA 6/6 4/4 | M2 | 1.050000 | $22.71 | $23.85 |
| MALLA 6-6 4/4 | MALLA ELECTROSOLDADA 6/6 4/4 | M2 | 1.050000 | $22.71 | $23.85 |
| Suma de Material | $543.93 | ||||
| Mano de Obra | |||||
| CUADRILLA -03 | (1 OFICIAL ALBAÑIL + 5 AYUDANTES). | JOR | 0.025000 | $1,555.10 | $38.88 |
| CUADRILLA -03 | (1 OFICIAL ALBAÑIL + 5 AYUDANTES). | JOR | 0.025000 | $1,555.10 | $38.88 |
| CUADRILLA -03 | (1 OFICIAL ALBAÑIL + 5 AYUDANTES). | JOR | 0.025000 | $1,555.10 | $38.88 |
| Suma de Mano de Obra | $116.63 | ||||
| Equipo | |||||
| API-REGLA VIBRATORIA | REGLA VIBRATORIA | hora | 0.010000 | $14.38 | $0.14 |
| API-REGLA VIBRATORIA | REGLA VIBRATORIA | hora | 0.010000 | $14.38 | $0.14 |
| API-REGLA VIBRATORIA | REGLA VIBRATORIA | hora | 0.010000 | $14.38 | $0.14 |
| API-ALLANADORA MEC | ALLANADORA MECANICA CON ASPAS | hora | 0.025000 | $36.69 | $0.92 |
| API-ALLANADORA MEC | ALLANADORA MECANICA CON ASPAS | hora | 0.025000 | $36.69 | $0.92 |
| API-ALLANADORA MEC | ALLANADORA MECANICA CON ASPAS | hora | 0.025000 | $36.69 | $0.92 |
| Suma de Equipo | $3.18 | ||||
| Costo Directo | $663.75 |