| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 4080 05 | CIMBRA DE MADERA PARA ACABADOS NO APARENTES EN MUROS HASTA 3.0 M. DE ALTURA. | M2. |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CIMBRA 04 | MADERA PINO 3a. | PT | 2.900000 | $9.00 | $26.10 |
| CIMBRA 04 | MADERA PINO 3a. | PT | 2.900000 | $9.00 | $26.10 |
| CIMBRA 04 | MADERA PINO 3a. | PT | 2.900000 | $9.00 | $26.10 |
| CIMBRA 04 | MADERA PINO 3a. | PT | 2.900000 | $9.00 | $26.10 |
| CIMBRA 04 | MADERA PINO 3a. | PT | 2.900000 | $9.00 | $26.10 |
| CIMBRA 04 | MADERA PINO 3a. | PT | 2.900000 | $9.00 | $26.10 |
| CIMBRA 04 | MADERA PINO 3a. | PT | 2.900000 | $9.00 | $26.10 |
| CIMBRA 04 | MADERA PINO 3a. | PT | 2.900000 | $9.00 | $26.10 |
| CIMBRA 04 | MADERA PINO 3a. | PT | 2.900000 | $9.00 | $26.10 |
| CIMBRA10 | SEPARADOR MET. | PZA | 2.000000 | $3.50 | $7.00 |
| CIMBRA10 | SEPARADOR MET. | PZA | 2.000000 | $3.50 | $7.00 |
| CIMBRA10 | SEPARADOR MET. | PZA | 2.000000 | $3.50 | $7.00 |
| CIMBRA10 | SEPARADOR MET. | PZA | 2.000000 | $3.50 | $7.00 |
| CIMBRA10 | SEPARADOR MET. | PZA | 2.000000 | $3.50 | $7.00 |
| CIMBRA10 | SEPARADOR MET. | PZA | 2.000000 | $3.50 | $7.00 |
| CIMBRA10 | SEPARADOR MET. | PZA | 2.000000 | $3.50 | $7.00 |
| CIMBRA10 | SEPARADOR MET. | PZA | 2.000000 | $3.50 | $7.00 |
| CIMBRA10 | SEPARADOR MET. | PZA | 2.000000 | $3.50 | $7.00 |
| CIMBRA 01 | CIMBRAPLAY 16 MM | M2 | 0.220000 | $95.00 | $20.90 |
| CIMBRA 01 | CIMBRAPLAY 16 MM | M2 | 0.220000 | $95.00 | $20.90 |
| CIMBRA 01 | CIMBRAPLAY 16 MM | M2 | 0.220000 | $95.00 | $20.90 |
| CIMBRA 01 | CIMBRAPLAY 16 MM | M2 | 0.220000 | $95.00 | $20.90 |
| CIMBRA 01 | CIMBRAPLAY 16 MM | M2 | 0.220000 | $95.00 | $20.90 |
| CIMBRA 01 | CIMBRAPLAY 16 MM | M2 | 0.220000 | $95.00 | $20.90 |
| CIMBRA 01 | CIMBRAPLAY 16 MM | M2 | 0.220000 | $95.00 | $20.90 |
| CIMBRA 01 | CIMBRAPLAY 16 MM | M2 | 0.220000 | $95.00 | $20.90 |
| CIMBRA 01 | CIMBRAPLAY 16 MM | M2 | 0.220000 | $95.00 | $20.90 |
| CIMBRA 02 | CLAVO (VARIAS MED.) | Kg. | 0.010000 | $11.00 | $0.11 |
| CIMBRA 02 | CLAVO (VARIAS MED.) | Kg. | 0.010000 | $11.00 | $0.11 |
| CIMBRA 02 | CLAVO (VARIAS MED.) | Kg. | 0.010000 | $11.00 | $0.11 |
| CIMBRA 02 | CLAVO (VARIAS MED.) | Kg. | 0.010000 | $11.00 | $0.11 |
| CIMBRA 02 | CLAVO (VARIAS MED.) | Kg. | 0.010000 | $11.00 | $0.11 |
| CIMBRA 02 | CLAVO (VARIAS MED.) | Kg. | 0.010000 | $11.00 | $0.11 |
| CIMBRA 02 | CLAVO (VARIAS MED.) | Kg. | 0.010000 | $11.00 | $0.11 |
| CIMBRA 02 | CLAVO (VARIAS MED.) | Kg. | 0.010000 | $11.00 | $0.11 |
| CIMBRA 02 | CLAVO (VARIAS MED.) | Kg. | 0.010000 | $11.00 | $0.11 |
| CONCRETO PREME-05 | DESMOLDANTE | LT | 0.500000 | $9.10 | $4.55 |
| CONCRETO PREME-05 | DESMOLDANTE | LT | 0.500000 | $9.10 | $4.55 |
| CONCRETO PREME-05 | DESMOLDANTE | LT | 0.500000 | $9.10 | $4.55 |
| CONCRETO PREME-05 | DESMOLDANTE | LT | 0.500000 | $9.10 | $4.55 |
| CONCRETO PREME-05 | DESMOLDANTE | LT | 0.500000 | $9.10 | $4.55 |
| CONCRETO PREME-05 | DESMOLDANTE | LT | 0.500000 | $9.10 | $4.55 |
| CONCRETO PREME-05 | DESMOLDANTE | LT | 0.500000 | $9.10 | $4.55 |
| CONCRETO PREME-05 | DESMOLDANTE | LT | 0.500000 | $9.10 | $4.55 |
| CONCRETO PREME-05 | DESMOLDANTE | LT | 0.500000 | $9.10 | $4.55 |
| Suma de Material | $527.94 | ||||
| Mano de Obra | |||||
| CUADRILLA NO. 11 | (1 Of. Carpintero O.N. + 1Ayte). | Jor | 0.142857 | $727.24 | $103.89 |
| CUADRILLA NO. 11 | (1 Of. Carpintero O.N. + 1Ayte). | Jor | 0.142857 | $727.24 | $103.89 |
| CUADRILLA NO. 11 | (1 Of. Carpintero O.N. + 1Ayte). | Jor | 0.142857 | $727.24 | $103.89 |
| CUADRILLA NO. 11 | (1 Of. Carpintero O.N. + 1Ayte). | Jor | 0.142857 | $727.24 | $103.89 |
| CUADRILLA NO. 11 | (1 Of. Carpintero O.N. + 1Ayte). | Jor | 0.142857 | $727.24 | $103.89 |
| CUADRILLA NO. 11 | (1 Of. Carpintero O.N. + 1Ayte). | Jor | 0.142857 | $727.24 | $103.89 |
| CUADRILLA NO. 11 | (1 Of. Carpintero O.N. + 1Ayte). | Jor | 0.142857 | $727.24 | $103.89 |
| CUADRILLA NO. 11 | (1 Of. Carpintero O.N. + 1Ayte). | Jor | 0.142857 | $727.24 | $103.89 |
| CUADRILLA NO. 11 | (1 Of. Carpintero O.N. + 1Ayte). | Jor | 0.142857 | $727.24 | $103.89 |
| Suma de Mano de Obra | $935.02 | ||||
| Costo Directo | $1,462.96 |