| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| BAS-T01 | BASE PARA TINACO RECTANGULAR DE 1.60 X 1.20 MTS., CON MURO DE TABIQUE ROJO RECOCIDO DE 6X12X24 CM. JUNTEADO CON MORTERO CEMENTO-ARENA 1:4 , ACABADO FINO 1:4 DE 2 CM., CADENA DE DESPLANTE DE 15X15 CM. PERIMETRAL DE CONCRETO F'C= 250 KG./CM2 ARMADA CON 4 VARILLAS DEL NÚMERO 3 , ESTRIBOS DEL NÚMERO 2, A CADA 20 CM. Y CADENA DE REMATE, MISMAS ESPECIFICACIONES, LOSA DE CONCRETO DE 10 CM. DE ESPESOR CON VARILLA DEL NÚMERO 3 A CADA 20 CM. DE SEPARACIÓN, CONCRETO F'C=250 KG./CM2, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO HERRAMIENTA, FLETES, ACARREOS, LIMPIEZA Y TODO LO NECESARIO, PARA SU CORRECTA EJECUCIÓN. | PZA |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CONCRETO PREME-03 | CONCRETO PREMEZCLADO DE 250 KG/CM2 | M3 | 0.340200 | $800.00 | $272.16 |
| CONCRETO PREME-03 | CONCRETO PREMEZCLADO DE 250 KG/CM2 | M3 | 0.340200 | $800.00 | $272.16 |
| MORTERO CEM-ARE. 1:4 | Mortero cemento arena 1:4 | M3 | 0.170000 | $596.18 | $101.35 |
| MORTERO CEM-ARE. 1:4 | Mortero cemento arena 1:4 | M3 | 0.170000 | $596.18 | $101.35 |
| ACERO 02 | ACERO DEL # 3 al 12 | KG | 15.615000 | $6.00 | $93.69 |
| ACERO 02 | ACERO DEL # 3 al 12 | KG | 15.615000 | $6.00 | $93.69 |
| ACERO 01 | ALAMBRE RECOCIDO | KG | 0.150000 | $8.82 | $1.32 |
| ACERO 01 | ALAMBRE RECOCIDO | KG | 0.150000 | $8.82 | $1.32 |
| CIMBRA 04 | MADERA PINO 3a. | PT | 3.500000 | $9.00 | $31.50 |
| CIMBRA 04 | MADERA PINO 3a. | PT | 3.500000 | $9.00 | $31.50 |
| CIMBRA 01 | CIMBRAPLAY 16 MM | M2 | 1.000000 | $95.00 | $95.00 |
| CIMBRA 01 | CIMBRAPLAY 16 MM | M2 | 1.000000 | $95.00 | $95.00 |
| CIMBRA 02 | CLAVO (VARIAS MED.) | Kg. | 0.300000 | $11.00 | $3.30 |
| CIMBRA 02 | CLAVO (VARIAS MED.) | Kg. | 0.300000 | $11.00 | $3.30 |
| ACERO 05 | ALAMBRON | KG | 0.687500 | $8.00 | $5.50 |
| ACERO 05 | ALAMBRON | KG | 0.687500 | $8.00 | $5.50 |
| TABIQUE ROJO REC | TABIQUE ROJO REC | PZA | 168.000000 | $0.95 | $159.60 |
| TABIQUE ROJO REC | TABIQUE ROJO REC | PZA | 168.000000 | $0.95 | $159.60 |
| Suma de Material | $1,526.85 | ||||
| Mano de Obra | |||||
| CUADRILLA NO. 09 | (1 Of. Albanil + 1 Peón) | Jor | 1.000000 | $713.26 | $713.26 |
| CUADRILLA NO. 09 | (1 Of. Albanil + 1 Peón) | Jor | 1.000000 | $713.26 | $713.26 |
| CUADRILLA NO. 16 | (1 Of. Fierrero + 1Ayudante). | Jor | 0.150000 | $727.24 | $109.09 |
| CUADRILLA NO. 16 | (1 Of. Fierrero + 1Ayudante). | Jor | 0.150000 | $727.24 | $109.09 |
| CUADRILLA NO. 11 | (1 Of. Carpintero O.N. + 1Ayte). | Jor | 0.125000 | $727.24 | $90.91 |
| CUADRILLA NO. 11 | (1 Of. Carpintero O.N. + 1Ayte). | Jor | 0.125000 | $727.24 | $90.91 |
| Suma de Mano de Obra | $1,826.50 | ||||
| Costo Directo | $3,353.35 |