| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | | | | |
| CONCRETO PRE-05 | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2, ELABORADO CON CEMENTO RESISTENTE A LOS SULFATOS Y ALCALISIS | M3 | 1.050000 | $816.00 | $856.80 |
| CONCRETO PRE-05 | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2, ELABORADO CON CEMENTO RESISTENTE A LOS SULFATOS Y ALCALISIS | M3 | 1.050000 | $816.00 | $856.80 |
| CONCRETO PRE-05 | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2, ELABORADO CON CEMENTO RESISTENTE A LOS SULFATOS Y ALCALISIS | M3 | 1.050000 | $816.00 | $856.80 |
| CONCRETO PRE-05 | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2, ELABORADO CON CEMENTO RESISTENTE A LOS SULFATOS Y ALCALISIS | M3 | 1.050000 | $816.00 | $856.80 |
| CONCRETO PRE-05 | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2, ELABORADO CON CEMENTO RESISTENTE A LOS SULFATOS Y ALCALISIS | M3 | 1.050000 | $816.00 | $856.80 |
| CONCRETO PRE-05 | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2, ELABORADO CON CEMENTO RESISTENTE A LOS SULFATOS Y ALCALISIS | M3 | 1.050000 | $816.00 | $856.80 |
| AGUA | AGUA | M3 | 0.060000 | $50.00 | $3.00 |
| AGUA | AGUA | M3 | 0.060000 | $50.00 | $3.00 |
| AGUA | AGUA | M3 | 0.060000 | $50.00 | $3.00 |
| AGUA | AGUA | M3 | 0.060000 | $50.00 | $3.00 |
| AGUA | AGUA | M3 | 0.060000 | $50.00 | $3.00 |
| AGUA | AGUA | M3 | 0.060000 | $50.00 | $3.00 |
| PAVIMENTO-06 | MEMBRANA DE CURADO WRMEADOWS | LT | 0.150000 | $8.89 | $1.33 |
| PAVIMENTO-06 | MEMBRANA DE CURADO WRMEADOWS | LT | 0.150000 | $8.89 | $1.33 |
| PAVIMENTO-06 | MEMBRANA DE CURADO WRMEADOWS | LT | 0.150000 | $8.89 | $1.33 |
| PAVIMENTO-06 | MEMBRANA DE CURADO WRMEADOWS | LT | 0.150000 | $8.89 | $1.33 |
| PAVIMENTO-06 | MEMBRANA DE CURADO WRMEADOWS | LT | 0.150000 | $8.89 | $1.33 |
| PAVIMENTO-06 | MEMBRANA DE CURADO WRMEADOWS | LT | 0.150000 | $8.89 | $1.33 |
| CIMBRA05 | CLAVO (VARIAS MED.) | Kg | 0.100000 | $16.25 | $1.63 |
| CIMBRA05 | CLAVO (VARIAS MED.) | Kg | 0.100000 | $16.25 | $1.63 |
| CIMBRA05 | CLAVO (VARIAS MED.) | Kg | 0.100000 | $16.25 | $1.63 |
| CIMBRA05 | CLAVO (VARIAS MED.) | Kg | 0.100000 | $16.25 | $1.63 |
| CIMBRA05 | CLAVO (VARIAS MED.) | Kg | 0.100000 | $16.25 | $1.63 |
| CIMBRA05 | CLAVO (VARIAS MED.) | Kg | 0.100000 | $16.25 | $1.63 |
| Suma de Material | | | | $5,176.55 |
| Mano de Obra | | | | |
| CUAD OC 02 | CUAD. 2 (1 ALBAñIL + 1 PEON) | JOR | 0.124362 | $876.36 | $108.99 |
| CUAD OC 02 | CUAD. 2 (1 ALBAñIL + 1 PEON) | JOR | 0.124362 | $876.36 | $108.99 |
| CUAD OC 02 | CUAD. 2 (1 ALBAñIL + 1 PEON) | JOR | 0.124362 | $876.36 | $108.99 |
| CUAD OC 02 | CUAD. 2 (1 ALBAñIL + 1 PEON) | JOR | 0.124362 | $876.36 | $108.99 |
| CUAD OC 02 | CUAD. 2 (1 ALBAñIL + 1 PEON) | JOR | 0.124362 | $876.36 | $108.99 |
| CUAD OC 02 | CUAD. 2 (1 ALBAñIL + 1 PEON) | JOR | 0.124362 | $876.36 | $108.99 |
| Suma de Mano de Obra | | | | $653.92 |
| Equipo | | | | |
| AMAQUINARIA-23 | VIBRADOR PARA CONCRETO MCA CIPSA CON MOTOR KOHLER 4 H.P. CONJUNTO CABEZAL DE 14" | HR | 0.137856 | $11.18 | $1.54 |
| AMAQUINARIA-23 | VIBRADOR PARA CONCRETO MCA CIPSA CON MOTOR KOHLER 4 H.P. CONJUNTO CABEZAL DE 14" | HR | 0.137856 | $11.18 | $1.54 |
| AMAQUINARIA-23 | VIBRADOR PARA CONCRETO MCA CIPSA CON MOTOR KOHLER 4 H.P. CONJUNTO CABEZAL DE 14" | HR | 0.137856 | $11.18 | $1.54 |
| AMAQUINARIA-23 | VIBRADOR PARA CONCRETO MCA CIPSA CON MOTOR KOHLER 4 H.P. CONJUNTO CABEZAL DE 14" | HR | 0.137856 | $11.18 | $1.54 |
| AMAQUINARIA-23 | VIBRADOR PARA CONCRETO MCA CIPSA CON MOTOR KOHLER 4 H.P. CONJUNTO CABEZAL DE 14" | HR | 0.137856 | $11.18 | $1.54 |
| AMAQUINARIA-23 | VIBRADOR PARA CONCRETO MCA CIPSA CON MOTOR KOHLER 4 H.P. CONJUNTO CABEZAL DE 14" | HR | 0.137856 | $11.18 | $1.54 |
| Suma de Equipo | | | | $9.25 |
| Auxiliar | | | | |
| CIMBRA COMUN EN ZAPA | CIMBRA COMUN | M2 | 18.510000 | $104.62 | $1,936.52 |
| CIMBRA COMUN EN ZAPA | CIMBRA COMUN | M2 | 18.510000 | $104.62 | $1,936.52 |
| CIMBRA COMUN EN ZAPA | CIMBRA COMUN | M2 | 18.510000 | $104.62 | $1,936.52 |
| CIMBRA COMUN EN ZAPA | CIMBRA COMUN | M2 | 18.510000 | $104.62 | $1,936.52 |
| CIMBRA COMUN EN ZAPA | CIMBRA COMUN | M2 | 18.510000 | $104.62 | $1,936.52 |
| CIMBRA COMUN EN ZAPA | CIMBRA COMUN | M2 | 18.510000 | $104.62 | $1,936.52 |
| Suma de Auxiliar | | | | $11,619.10 |
| Costo Directo | | | | $17,458.81 |