| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| NCTR-CAR-1-0 | CONCRETO HIDRAULICO COLADO EN SECO DE F'C=150KG/CM2 | m3 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CONCRETO PREM-150 | concreto premezclado de f`c=150 kg/cm2 CPO 30 R RS BRA (resistente a los sulfatos) | m3 | 1.030000 | $820.00 | $844.60 |
| REVENIMIENTO | Revenimiento 14 +/- 3.5 cms | m3 | 1.030000 | $75.00 | $77.25 |
| CONCRETO PRE-02 | BOMBEO PARA CONCRETO PREMEZCLADO | M3 | 1.030000 | $140.00 | $144.20 |
| Suma de Material | $1,066.05 | ||||
| Mano de Obra | |||||
| DIPSA-05 | OF. ALBAÑIL | Jor | 0.200000 | $404.46 | $80.89 |
| D1AA01 | Ayudante general | Jor | 0.200000 | $294.98 | $59.00 |
| DIPSA-03 | CABO | Jor | 0.040000 | $482.65 | $19.31 |
| Suma de Mano de Obra | $159.19 | ||||
| Herramienta | |||||
| HERRAMIENTA MENOR.. | HERRAMIENTA MENOR | (%)mo | 0.020000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Auxiliar | |||||
| BASICOCIMBRA | ELABORACION DE CIMBRA | M2 | 0.100000 | $285.33 | $28.53 |
| Suma de Auxiliar | $28.53 | ||||
| Costo Directo | $1,253.78 |