| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 78 | De 56 x 147cm. (un Tablero) | pza |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| SCT-MAT-SEÑAL-07 | SID-8 De 56 x 147cm. (un Tablero) | pza | 1.000000 | $1,600.00 | $1,600.00 |
| Suma de Material | $1,600.00 | ||||
| Mano de Obra | |||||
| SCT-CUA-15 | Cuadrilla (1 Albañil + 5 Ayudantes) | Jor | 0.037116 | $2,452.70 | $91.03 |
| Suma de Mano de Obra | $91.03 | ||||
| Herramienta | |||||
| SCT-HERR-01 | Herramienta menor | (%)mo | 0.020000 | $0.00 | $0.00 |
| SCT-HERR-02 | Seguridad industrial | (%)mo | 0.020000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Equipo | |||||
| SCT-EQ-27 | Camioneta f-350 ford de 3 tn de 140 hp | Hora | 0.050000 | $218.52 | $10.93 |
| Suma de Equipo | $10.93 | ||||
| Auxiliar | |||||
| SCT-AUX-CONC-01 | Concreto fc=150 kg/cm2, r.n., tma 19mm (3/4"), | m3 | 0.070000 | $130.76 | $9.15 |
| Suma de Auxiliar | $9.15 | ||||
| Costo Directo | $1,711.11 |