| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | | | | |
| CONCRETO PRE-250. | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2 PREMEZCLADO RESISTENTE A SULFATOS | M3 | 1.030000 | $950.40 | $978.91 |
| CONCRETO PRE-250. | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2 PREMEZCLADO RESISTENTE A SULFATOS | M3 | 1.030000 | $950.40 | $978.91 |
| CONCRETO PRE-250. | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2 PREMEZCLADO RESISTENTE A SULFATOS | M3 | 1.030000 | $950.40 | $978.91 |
| CONCRETO PRE-250. | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2 PREMEZCLADO RESISTENTE A SULFATOS | M3 | 1.030000 | $950.40 | $978.91 |
| CONCRETO PRE-250. | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2 PREMEZCLADO RESISTENTE A SULFATOS | M3 | 1.030000 | $950.40 | $978.91 |
| CONCRETO PRE-250. | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2 PREMEZCLADO RESISTENTE A SULFATOS | M3 | 1.030000 | $950.40 | $978.91 |
| IMPERMEABILIZANTE IN | IMPERMEABILIZANTE INTEGRAL SUMINSTRADO EN PLANTA | m3 | 1.030000 | $80.00 | $82.40 |
| IMPERMEABILIZANTE IN | IMPERMEABILIZANTE INTEGRAL SUMINSTRADO EN PLANTA | m3 | 1.030000 | $80.00 | $82.40 |
| IMPERMEABILIZANTE IN | IMPERMEABILIZANTE INTEGRAL SUMINSTRADO EN PLANTA | m3 | 1.030000 | $80.00 | $82.40 |
| IMPERMEABILIZANTE IN | IMPERMEABILIZANTE INTEGRAL SUMINSTRADO EN PLANTA | m3 | 1.030000 | $80.00 | $82.40 |
| IMPERMEABILIZANTE IN | IMPERMEABILIZANTE INTEGRAL SUMINSTRADO EN PLANTA | m3 | 1.030000 | $80.00 | $82.40 |
| IMPERMEABILIZANTE IN | IMPERMEABILIZANTE INTEGRAL SUMINSTRADO EN PLANTA | m3 | 1.030000 | $80.00 | $82.40 |
| REVENIMIENTO | Revenimiento 14 +/- 3.5 cms | m3 | 1.030000 | $80.00 | $82.40 |
| REVENIMIENTO | Revenimiento 14 +/- 3.5 cms | m3 | 1.030000 | $80.00 | $82.40 |
| REVENIMIENTO | Revenimiento 14 +/- 3.5 cms | m3 | 1.030000 | $80.00 | $82.40 |
| REVENIMIENTO | Revenimiento 14 +/- 3.5 cms | m3 | 1.030000 | $80.00 | $82.40 |
| REVENIMIENTO | Revenimiento 14 +/- 3.5 cms | m3 | 1.030000 | $80.00 | $82.40 |
| REVENIMIENTO | Revenimiento 14 +/- 3.5 cms | m3 | 1.030000 | $80.00 | $82.40 |
| SERVICIO DE BOMBEO | servicio de bombeo | m3 | 1.030000 | $130.00 | $133.90 |
| SERVICIO DE BOMBEO | servicio de bombeo | m3 | 1.030000 | $130.00 | $133.90 |
| SERVICIO DE BOMBEO | servicio de bombeo | m3 | 1.030000 | $130.00 | $133.90 |
| SERVICIO DE BOMBEO | servicio de bombeo | m3 | 1.030000 | $130.00 | $133.90 |
| SERVICIO DE BOMBEO | servicio de bombeo | m3 | 1.030000 | $130.00 | $133.90 |
| SERVICIO DE BOMBEO | servicio de bombeo | m3 | 1.030000 | $130.00 | $133.90 |
| PRUEBAS DE LAB. CONC | prueba de laboratorio para concreto | pza | 0.025000 | $640.00 | $16.00 |
| PRUEBAS DE LAB. CONC | prueba de laboratorio para concreto | pza | 0.025000 | $640.00 | $16.00 |
| PRUEBAS DE LAB. CONC | prueba de laboratorio para concreto | pza | 0.025000 | $640.00 | $16.00 |
| PRUEBAS DE LAB. CONC | prueba de laboratorio para concreto | pza | 0.025000 | $640.00 | $16.00 |
| PRUEBAS DE LAB. CONC | prueba de laboratorio para concreto | pza | 0.025000 | $640.00 | $16.00 |
| PRUEBAS DE LAB. CONC | prueba de laboratorio para concreto | pza | 0.025000 | $640.00 | $16.00 |
| MEMBRANA DE CURADO | MEMBRANA DE CURADO | LT | 0.150000 | $9.50 | $1.43 |
| MEMBRANA DE CURADO | MEMBRANA DE CURADO | LT | 0.150000 | $9.50 | $1.43 |
| MEMBRANA DE CURADO | MEMBRANA DE CURADO | LT | 0.150000 | $9.50 | $1.43 |
| MEMBRANA DE CURADO | MEMBRANA DE CURADO | LT | 0.150000 | $9.50 | $1.43 |
| MEMBRANA DE CURADO | MEMBRANA DE CURADO | LT | 0.150000 | $9.50 | $1.43 |
| MEMBRANA DE CURADO | MEMBRANA DE CURADO | LT | 0.150000 | $9.50 | $1.43 |
| Suma de Material | | | | $7,770.22 |
| Mano de Obra | | | | |
| CUAD OC 10 | (1 Of. Albanil + 5 Peones). | JOR | 0.040000 | $1,892.05 | $75.68 |
| CUAD OC 10 | (1 Of. Albanil + 5 Peones). | JOR | 0.040000 | $1,892.05 | $75.68 |
| CUAD OC 10 | (1 Of. Albanil + 5 Peones). | JOR | 0.040000 | $1,892.05 | $75.68 |
| CUAD OC 10 | (1 Of. Albanil + 5 Peones). | JOR | 0.040000 | $1,892.05 | $75.68 |
| CUAD OC 10 | (1 Of. Albanil + 5 Peones). | JOR | 0.040000 | $1,892.05 | $75.68 |
| CUAD OC 10 | (1 Of. Albanil + 5 Peones). | JOR | 0.040000 | $1,892.05 | $75.68 |
| Suma de Mano de Obra | | | | $454.09 |
| Equipo | | | | |
| AEQAVB001 | Vibrador de Concreto mot. gasolina 8 hp Kolher flecha 14" cabezal AA48 de 17/8" (45mm). | h | 0.320000 | $42.66 | $13.65 |
| AEQAVB001 | Vibrador de Concreto mot. gasolina 8 hp Kolher flecha 14" cabezal AA48 de 17/8" (45mm). | h | 0.320000 | $42.66 | $13.65 |
| AEQAVB001 | Vibrador de Concreto mot. gasolina 8 hp Kolher flecha 14" cabezal AA48 de 17/8" (45mm). | h | 0.320000 | $42.66 | $13.65 |
| AEQAVB001 | Vibrador de Concreto mot. gasolina 8 hp Kolher flecha 14" cabezal AA48 de 17/8" (45mm). | h | 0.320000 | $42.66 | $13.65 |
| AEQAVB001 | Vibrador de Concreto mot. gasolina 8 hp Kolher flecha 14" cabezal AA48 de 17/8" (45mm). | h | 0.320000 | $42.66 | $13.65 |
| AEQAVB001 | Vibrador de Concreto mot. gasolina 8 hp Kolher flecha 14" cabezal AA48 de 17/8" (45mm). | h | 0.320000 | $42.66 | $13.65 |
| Suma de Equipo | | | | $81.91 |
| Costo Directo | | | | $8,306.22 |