| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| ACAB-13 | SUMINISTRO Y COLOCACIÓN DE PLAFON MODULAR DE 0.61 X 0.61 m, A BASE DE FIBRAS MINERALES, SUSPENDIDO DE LA LOSA MEDIANTE PERFILES "T" Y ANGULOS PERIMETRALES; INCLUYE: ACARREO DE LOS MATERIALES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO. | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| OC-MAT-PLAF-01 | T PRINCIPAL DONN DE 3.66 M | m | 0.878000 | $17.39 | $15.27 |
| OC-MAT-PLAF-02 | T CONECTORA DONN DE 0.61 M | m | 0.830000 | $15.21 | $12.62 |
| OC-MAT-PLAF-09 | T CONEcTORA DONN DE 1.22 M | m | 1.659000 | $14.30 | $23.72 |
| OC-MAT-PLAF-04 | ANGULO DE 3.66 M DOON | m | 0.400000 | $9.73 | $3.89 |
| OC-MAT-PLAF-03 | PLAFON DE 61 X 61 CMS ARMSTRONG | pza | 2.770000 | $43.10 | $119.39 |
| OC-MAT-PLAF-05 | ALAMBRE GALVANIZADO No. 12 | kg | 0.300000 | $30.00 | $9.00 |
| Suma de Material | $183.90 | ||||
| Mano de Obra | |||||
| CMR-CUA-OC-092 | Cuadrilla Obra Civil (1 Colocador + 1 Ayudante) | jor | 0.053080 | $928.39 | $49.28 |
| Suma de Mano de Obra | $49.28 | ||||
| Herramienta | |||||
| 100200-1000 | Herramienta menor | (%)mo | 0.030000 | $0.00 | $0.00 |
| CMR-HERR-02 | Equipo de Seguridad (Casco, Botas, Guantes, Gafas, Chaleco Preventivo) | (%)mo | 0.030000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Auxiliar | |||||
| OC-AUX-AND-01 | Andamio de acero tubular de 2.00m. de altura con ruedas y base de tablones de madera. | r/d | 0.042280 | $47.00 | $1.99 |
| Suma de Auxiliar | $1.99 | ||||
| Costo Directo | $235.16 |