| Clave | Descripci贸n del An谩lisis de Precio Unitario | Unidad |
| E.P. 03-11 | Trabes caj贸n de 1.50 M de peralte y 27.9 M de claro presforzadas de concreto F' C = 350 KG/CM2 | pzas |
| Clave | Descripci贸n | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| TRABE8 | TRABE DE 1.50X 27.90 M | PZA | 1.000000 | $101,446.08 | $101,446.08 |
| Suma de Material | $101,446.08 | ||||
| Auxiliar | |||||
| AUM6 | TRANSPORTE DE TRABE 2 | M3 | 17.772300 | $690.31 | $12,268.40 |
| AUT7 | MONTAJE DE TRABE 2 | M3 | 17.772300 | $740.09 | $13,153.10 |
| Suma de Auxiliar | $25,421.50 | ||||
| Costo Directo | $126,867.58 |