| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| HER-23. | PUERTAS Y VENTANAS DE HERRERIA TIPO COLONIAL (HERRERIA FORJADO SIMILAR VERJAS DE CHAPULTEPEC), SEGÚN PROYECTO, EL PRECIO UNITARIO INCLUYE: MATERIALES, EQUIPO, ANDAMIO, MANO DE OBRA Y HERRAMIENTA. | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| REDONDO LISO | REDONDO LISO | kg | 11.000000 | $11.00 | $121.00 |
| REDONDO LISO | REDONDO LISO | kg | 11.000000 | $11.00 | $121.00 |
| SOLDADURA 7018 | SOLDADURA 70/18 | KG | 1.000000 | $22.00 | $22.00 |
| SOLDADURA 7018 | SOLDADURA 70/18 | KG | 1.000000 | $22.00 | $22.00 |
| COMBUSTIBLE 03 | GASOLINA | LT | 1.000000 | $5.48 | $5.48 |
| COMBUSTIBLE 03 | GASOLINA | LT | 1.000000 | $5.48 | $5.48 |
| OXIGENO | OXIGENO | M3 | 1.600000 | $29.00 | $46.40 |
| OXIGENO | OXIGENO | M3 | 1.600000 | $29.00 | $46.40 |
| SOLERA | solera de 11/2" | kg | 1.000000 | $10.00 | $10.00 |
| SOLERA | solera de 11/2" | kg | 1.000000 | $10.00 | $10.00 |
| HERRAJES MET. | HERRAJES MENORES | PZA | 10.000000 | $50.00 | $500.00 |
| HERRAJES MET. | HERRAJES MENORES | PZA | 10.000000 | $50.00 | $500.00 |
| Suma de Material | $1,409.76 | ||||
| Mano de Obra | |||||
| CUADRILLA NO. 22 | (1 OF. Herrero+1 AYUD.) | Jor | 1.000000 | $448.80 | $448.80 |
| CUADRILLA NO. 22 | (1 OF. Herrero+1 AYUD.) | Jor | 1.000000 | $448.80 | $448.80 |
| Suma de Mano de Obra | $897.60 | ||||
| Equipo | |||||
| EQUIPO DE CORTE | EQUIPO DE CORTE DE OXI-ACETILENO CON ACCESORIOS HARRIS | HR | 3.000000 | $0.59 | $1.77 |
| EQUIPO DE CORTE | EQUIPO DE CORTE DE OXI-ACETILENO CON ACCESORIOS HARRIS | HR | 3.000000 | $0.59 | $1.77 |
| ESMERILADORA | ESMERILADORA | HR | 2.000000 | $19.29 | $38.58 |
| ESMERILADORA | ESMERILADORA | HR | 2.000000 | $19.29 | $38.58 |
| MAQ. SOLDAR EST. | Soldadora Miller Dimension Mod. 652 | HR | 8.000000 | $6.75 | $54.00 |
| MAQ. SOLDAR EST. | Soldadora Miller Dimension Mod. 652 | HR | 8.000000 | $6.75 | $54.00 |
| Suma de Equipo | $188.70 | ||||
| Costo Directo | $2,496.06 |