| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| ACA-09. | FORJADO DE CORNIZA MOLDURA DE ENJARRE A BASE DE CONCRETO F'C=200KG/CM2 TMA 19MM REFORZADO CON 4 VARILLA 3/8'' Y ESTRIBOS DE ALAMBRON 1/4'' EN FORMA DE GRAPA A CADA 17CM, DE 25.50X30.00CM, PERFILADO DE ARRIBA ABAJO 5.00CM VERTICAL BAJA, 10.00CM PECHO PALOMA EN DIAGONAL FORMA DE "S", 1.00CM VERTICAL BAJA, 1.50CM HORIZONTAL DERECHA, 3.00CM VERTICAL BAJA, 3.00CM HORIZONTAL DERECHA, 9.00CM VERTICAL BAJA, 8.50CM HORIZONTAL DERECHA, PARA VISTA FRONTAL PERIMETRAL, INCLUYE PREVIAMENTE PREPARACION DE MOLDES, ACABADO APARENTE LISO, ACARREOS Y ELEVACION, EL PRECIO UNITARIO INCLUYE: MATERIALES, ANDAMIO, MANO DE OBRA Y HERRAMIENTA. | ML |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CONCRETO F-C=200 H/O | Concreto f'c=200 kg/cm2 hecho en obra resistencia normal, agregado maximo 3/4" | M3 | 0.031500 | $723.12 | $22.78 |
| CONCRETO F-C=200 H/O | Concreto f'c=200 kg/cm2 hecho en obra resistencia normal, agregado maximo 3/4" | M3 | 0.031500 | $723.12 | $22.78 |
| CONCRETO F-C=200 H/O | Concreto f'c=200 kg/cm2 hecho en obra resistencia normal, agregado maximo 3/4" | M3 | 0.031500 | $723.12 | $22.78 |
| CONCRETO F-C=200 H/O | Concreto f'c=200 kg/cm2 hecho en obra resistencia normal, agregado maximo 3/4" | M3 | 0.031500 | $723.12 | $22.78 |
| MORTERO CEM-ARE. 1:4 | Mortero cemento arena 1:4 | M3 | 0.080000 | $649.72 | $51.98 |
| MORTERO CEM-ARE. 1:4 | Mortero cemento arena 1:4 | M3 | 0.080000 | $649.72 | $51.98 |
| MORTERO CEM-ARE. 1:4 | Mortero cemento arena 1:4 | M3 | 0.080000 | $649.72 | $51.98 |
| MORTERO CEM-ARE. 1:4 | Mortero cemento arena 1:4 | M3 | 0.080000 | $649.72 | $51.98 |
| MOLDE-MOLDURA | CIMBRA METALICA PARA CORNIZA | ML | 4.000000 | $50.00 | $200.00 |
| MOLDE-MOLDURA | CIMBRA METALICA PARA CORNIZA | ML | 4.000000 | $50.00 | $200.00 |
| MOLDE-MOLDURA | CIMBRA METALICA PARA CORNIZA | ML | 4.000000 | $50.00 | $200.00 |
| MOLDE-MOLDURA | CIMBRA METALICA PARA CORNIZA | ML | 4.000000 | $50.00 | $200.00 |
| ACERO 03 | ACERO DEL # (3/) | KG | 2.670000 | $6.00 | $16.02 |
| ACERO 03 | ACERO DEL # (3/) | KG | 2.670000 | $6.00 | $16.02 |
| ACERO 03 | ACERO DEL # (3/) | KG | 2.670000 | $6.00 | $16.02 |
| ACERO 03 | ACERO DEL # (3/) | KG | 2.670000 | $6.00 | $16.02 |
| ACERO-022 | ALAMBRON | KG | 1.200000 | $6.00 | $7.20 |
| ACERO-022 | ALAMBRON | KG | 1.200000 | $6.00 | $7.20 |
| ACERO-022 | ALAMBRON | KG | 1.200000 | $6.00 | $7.20 |
| ACERO-022 | ALAMBRON | KG | 1.200000 | $6.00 | $7.20 |
| CIMBRA 04 | MADERA PINO 3a. | PT | 0.700000 | $5.00 | $3.50 |
| CIMBRA 04 | MADERA PINO 3a. | PT | 0.700000 | $5.00 | $3.50 |
| CIMBRA 04 | MADERA PINO 3a. | PT | 0.700000 | $5.00 | $3.50 |
| CIMBRA 04 | MADERA PINO 3a. | PT | 0.700000 | $5.00 | $3.50 |
| CIMBRA 02 | CLAVO (VARIAS MED.) | Kg. | 0.100000 | $11.00 | $1.10 |
| CIMBRA 02 | CLAVO (VARIAS MED.) | Kg. | 0.100000 | $11.00 | $1.10 |
| CIMBRA 02 | CLAVO (VARIAS MED.) | Kg. | 0.100000 | $11.00 | $1.10 |
| CIMBRA 02 | CLAVO (VARIAS MED.) | Kg. | 0.100000 | $11.00 | $1.10 |
| CIMBRA 01 | CIMBRAPLAY 16 MM | M2 | 0.100000 | $80.00 | $8.00 |
| CIMBRA 01 | CIMBRAPLAY 16 MM | M2 | 0.100000 | $80.00 | $8.00 |
| CIMBRA 01 | CIMBRAPLAY 16 MM | M2 | 0.100000 | $80.00 | $8.00 |
| CIMBRA 01 | CIMBRAPLAY 16 MM | M2 | 0.100000 | $80.00 | $8.00 |
| CONCRETO 04 | DESMOLDANTE SEPAROL DE SIKA | LT | 0.200000 | $10.00 | $2.00 |
| CONCRETO 04 | DESMOLDANTE SEPAROL DE SIKA | LT | 0.200000 | $10.00 | $2.00 |
| CONCRETO 04 | DESMOLDANTE SEPAROL DE SIKA | LT | 0.200000 | $10.00 | $2.00 |
| CONCRETO 04 | DESMOLDANTE SEPAROL DE SIKA | LT | 0.200000 | $10.00 | $2.00 |
| ACERO-021 | ALAMBRE RECOCIDO | KG | 0.010000 | $10.43 | $0.10 |
| ACERO-021 | ALAMBRE RECOCIDO | KG | 0.010000 | $10.43 | $0.10 |
| ACERO-021 | ALAMBRE RECOCIDO | KG | 0.010000 | $10.43 | $0.10 |
| ACERO-021 | ALAMBRE RECOCIDO | KG | 0.010000 | $10.43 | $0.10 |
| Suma de Material | $1,250.72 | ||||
| Mano de Obra | |||||
| CUADRILLA NO. 09 | (1 Of. Albanil + 1 Peón) | Jor | 0.400000 | $440.17 | $176.07 |
| CUADRILLA NO. 09 | (1 Of. Albanil + 1 Peón) | Jor | 0.400000 | $440.17 | $176.07 |
| CUADRILLA NO. 09 | (1 Of. Albanil + 1 Peón) | Jor | 0.400000 | $440.17 | $176.07 |
| CUADRILLA NO. 09 | (1 Of. Albanil + 1 Peón) | Jor | 0.400000 | $440.17 | $176.07 |
| Suma de Mano de Obra | $704.27 | ||||
| Equipo | |||||
| VIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.100000 | $15.98 | $1.60 |
| VIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.100000 | $15.98 | $1.60 |
| VIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.100000 | $15.98 | $1.60 |
| VIBRADOR CONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.100000 | $15.98 | $1.60 |
| Suma de Equipo | $6.39 | ||||
| Costo Directo | $1,961.38 |