| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| CIM-06 | CADENA DE DESPLANTE DE CIMENTACION DE CONCRETO HIDRAULICO F'C=200KG/CM2 DE 20X35CM, ARMADO CON 4 VARILLAS DEL No.3 Y ESTRIBOS DEL No.2 A CADA 15CM, INCLUYE CIMBRA Y DESCIMBRA ACABADO COMUN, EL PRECIO UNITARIO INCLUYE: MATERIALES, ANDAMIO, MANO DE OBRA Y HERRAMIENTA. | ML |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CIMBRA 01 | CIMBRAPLAY 16 MM | M2 | 0.200000 | $80.00 | $16.00 |
| CIMBRA 01 | CIMBRAPLAY 16 MM | M2 | 0.200000 | $80.00 | $16.00 |
| CIMBRA 02 | CLAVO (VARIAS MED.) | Kg. | 2.000000 | $11.00 | $22.00 |
| CIMBRA 02 | CLAVO (VARIAS MED.) | Kg. | 2.000000 | $11.00 | $22.00 |
| CIMBRA 04 | MADERA PINO 3a. | PT | 5.000000 | $5.00 | $25.00 |
| CIMBRA 04 | MADERA PINO 3a. | PT | 5.000000 | $5.00 | $25.00 |
| CONCRETO 04 | DESMOLDANTE SEPAROL DE SIKA | LT | 0.350000 | $10.00 | $3.50 |
| CONCRETO 04 | DESMOLDANTE SEPAROL DE SIKA | LT | 0.350000 | $10.00 | $3.50 |
| ACERO 04 | ACERO DEL No. 4 | KG | 9.050000 | $6.00 | $54.30 |
| ACERO 04 | ACERO DEL No. 4 | KG | 9.050000 | $6.00 | $54.30 |
| ACERO-021 | ALAMBRE RECOCIDO | KG | 0.271500 | $10.43 | $2.83 |
| ACERO-021 | ALAMBRE RECOCIDO | KG | 0.271500 | $10.43 | $2.83 |
| CONCRETO PREM 200 | CONCRETO PREMEZCLADO DE F`C=200 KG/CM2 | M3 | 0.077000 | $824.77 | $63.51 |
| CONCRETO PREM 200 | CONCRETO PREMEZCLADO DE F`C=200 KG/CM2 | M3 | 0.077000 | $824.77 | $63.51 |
| CONCRETO 01 | BOMBA PARA CONCRETO PREMEZCLADA | M3 | 0.077000 | $100.00 | $7.70 |
| CONCRETO 01 | BOMBA PARA CONCRETO PREMEZCLADA | M3 | 0.077000 | $100.00 | $7.70 |
| Suma de Material | $389.68 | ||||
| Mano de Obra | |||||
| CUADRILLA NO. 01 | (1 peón). | Jor | 0.050000 | $176.48 | $8.82 |
| CUADRILLA NO. 01 | (1 peón). | Jor | 0.050000 | $176.48 | $8.82 |
| CUADRILLA NO. 16 | (1 Of. Fierrero + 1Ayudante). | Jor | 0.100000 | $448.80 | $44.88 |
| CUADRILLA NO. 16 | (1 Of. Fierrero + 1Ayudante). | Jor | 0.100000 | $448.80 | $44.88 |
| CUADRILLA NO. 11 | (1 Of. Carpintero O.N. + 1Ayte). | Jor | 0.130000 | $448.80 | $58.34 |
| CUADRILLA NO. 11 | (1 Of. Carpintero O.N. + 1Ayte). | Jor | 0.130000 | $448.80 | $58.34 |
| CUADRILLA NO. 10 | (1 Of. Albanil + 5 Peones). | JOR | 0.040000 | $1,094.57 | $43.78 |
| CUADRILLA NO. 10 | (1 Of. Albanil + 5 Peones). | JOR | 0.040000 | $1,094.57 | $43.78 |
| Suma de Mano de Obra | $311.66 | ||||
| Costo Directo | $701.34 |