| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| A-5 | CIMBRA EN ZAPATAS Y DADOS DE CIMENTACION. | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CIMBRAPLAY16 MM | CIMBRAPLAY DE 16MM EN M2 | M2 | 0.220000 | $95.00 | $20.90 |
| CIMBRAPLAY16 MM | CIMBRAPLAY DE 16MM EN M2 | M2 | 0.220000 | $95.00 | $20.90 |
| MADERAPINO3A | MADERA DE PINO DE 3 ERA. EN EN PIE TABLON | PT | 3.123000 | $7.50 | $23.42 |
| MADERAPINO3A | MADERA DE PINO DE 3 ERA. EN EN PIE TABLON | PT | 3.123000 | $7.50 | $23.42 |
| CLAVO | CLAVO EN KG | KG | 0.150000 | $13.00 | $1.95 |
| CLAVO | CLAVO EN KG | KG | 0.150000 | $13.00 | $1.95 |
| DESMOLTANTESIKA | DESMOLDANTE SEPAROL DE SIKA EN LTS | LT | 0.300000 | $13.80 | $4.14 |
| DESMOLTANTESIKA | DESMOLDANTE SEPAROL DE SIKA EN LTS | LT | 0.300000 | $13.80 | $4.14 |
| A4BAR012 | Alambre recocido Calibre 18 | kg | 0.090000 | $14.52 | $1.31 |
| A4BAR012 | Alambre recocido Calibre 18 | kg | 0.090000 | $14.52 | $1.31 |
| ALAMBRON1/4 | ALAMBRON 1/4" | KG | 0.900000 | $10.00 | $9.00 |
| ALAMBRON1/4 | ALAMBRON 1/4" | KG | 0.900000 | $10.00 | $9.00 |
| Suma de Material | $121.44 | ||||
| Mano de Obra | |||||
| CUAD OC 11 | (1 Of. Carpintero O.N. + 1 Ayud.) | jor | 0.113000 | $765.24 | $86.47 |
| CUAD OC 11 | (1 Of. Carpintero O.N. + 1 Ayud.) | jor | 0.113000 | $765.24 | $86.47 |
| Suma de Mano de Obra | $172.94 | ||||
| Costo Directo | $294.38 |