| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 3.1.15 | Construcción de registros colectores | PZA |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| MA2026 | CALHIDRA | KG | 0.200000 | $0.81 | $0.16 |
| MA2079 | HILO CAÑAMO | PZA | 0.000971 | $10.30 | $0.01 |
| MA2100 | MADERA DE PINO DE 3A PARA CIMBRA | PT | 0.006522 | $9.20 | $0.06 |
| MA2048 | CURACRETO ROJO | LT | 6.500000 | $7.52 | $48.88 |
| Suma de Material | $49.11 | ||||
| Mano de Obra | |||||
| MO020 | TOPOGRAFO | JOR | 0.002399 | $643.30 | $1.54 |
| MO005 | CADENERO | JOR | 0.003493 | $390.59 | $1.36 |
| MO001 | AYUDANTE GENERAL | JOR | 1.493480 | $308.92 | $461.37 |
| MO004 | CABO DE OFICIOS | JOR | 0.062492 | $852.29 | $53.26 |
| Suma de Mano de Obra | $517.53 | ||||
| Herramienta | |||||
| %MO118 | EQUIPO SEGURIDAD PERSONAL | (%)mo | 0.030000 | $0.00 | $0.00 |
| %MO116 | HERRAMIENTA MANUAL | (%)mo | 0.030000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Equipo | |||||
| EQTC42 | NIVEL DE TOPOGRAFIA MCA. K+E | HORA | 0.001821 | $5.49 | $0.01 |
| EQTC15 | COMPACTADOR MANUAL DE PLACA VIBRATORIA | HORA | 1.605295 | $103.62 | $166.34 |
| EQTC07 | CAMION DE VOLTEO DE 7 M3 | HORA | 0.028594 | $295.78 | $8.46 |
| Suma de Equipo | $174.81 | ||||
| Auxiliar | |||||
| BAEXCAV | BASICO DE EXCAVACIONES EN MAT A Y B | M3 | 11.310000 | $35.12 | $397.21 |
| BAACEROREF | BASICO SUM HABIL Y COLOC ACERO REFZO | TON | 0.052328 | $16,947.57 | $886.83 |
| CIMBRA EN MUROS | BASICO DE CIMBRA | M2 | 13.800000 | $69.25 | $955.65 |
| BACONC100 | ELABORACION CONCRETO 100 KG/CM2 | M3 | 0.065016 | $886.71 | $57.65 |
| ELAB CON 200 | ELABORACION CONCRETO F'c=200KG/CM2 | M3 | 2.200000 | $1,188.13 | $2,613.89 |
| Suma de Auxiliar | $4,911.23 | ||||
| Costo Directo | $5,652.68 |