| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| CIM-03-- | DADOS | PZA |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| IMPERM. INTEGRAL | IMPERMEABILIZANTE INTEGRAL | M3 | 8.830000 | $80.00 | $706.40 |
| Suma de Material | $706.40 | ||||
| Auxiliar | |||||
| CE-02-01 | CIMBRA COMUN | M2 | 17.130000 | $170.37 | $2,918.44 |
| CONCRETO BOMB 300 | CONCRETO PREMEZCLADO FC=300 KG/CM2 BOMBEABLE | M3 | 8.830000 | $1,377.66 | $12,164.74 |
| ACERO NO. 3 - 8 | ACERO DE REFUERZO DEL No. 3 AL No.8 | kg | 562.990000 | $14.89 | $8,382.92 |
| Suma de Auxiliar | $23,466.10 | ||||
| Costo Directo | $24,172.50 |