| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| CIM-03 | Z-1 DE 2.7*2.7 DADO DE 0.80*0.50 PARR #5 A/C 15 CMS , 16#6 EN DADO ESTRIBOS #3 A/C 20 TRIPLES F'C 300 KG/CM2 PUZOLANICO | PZA |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| IMPERM. INTEGRAL | IMPERMEABILIZANTE INTEGRAL | M3 | 3.230000 | $80.00 | $258.40 |
| Suma de Material | $258.40 | ||||
| Auxiliar | |||||
| CE-02-01 | CIMBRA COMUN | M2 | 5.920000 | $170.37 | $1,008.59 |
| CONCRETO BOMB 300 | CONCRETO PREMEZCLADO FC=300 KG/CM2 BOMBEABLE | M3 | 3.230000 | $1,377.66 | $4,449.84 |
| ACERO NO. 3 - 8 | ACERO DE REFUERZO DEL No. 3 AL No.8 | kg | 226.250000 | $14.89 | $3,368.86 |
| Suma de Auxiliar | $8,827.29 | ||||
| Costo Directo | $9,085.69 |