| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| PIME012 | SUMNISTRO E INSTALACION DE CILINDRO DE ACERO CON 8 MTS DE OXIGENO | PZA |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CILINDRO ACERO 8 LTR | CILINDRO DE ACERO CON 8 MTS DE OXIGENO | PZA | 1.000000 | $2,100.00 | $2,100.00 |
| ANGULO 1 1/2" X 1/4" | ANGULO 1 1/2" X 1/4" | KG | 0.250000 | $4.65 | $1.16 |
| TAQUETE SCI 3/8" | TAQUETE SCI 3/8" | PZA | 2.000000 | $4.50 | $9.00 |
| TORNILO 3/8X 1 1/2 | TORNILO 3/8X 1 1/2 | PZA | 2.000000 | $1.50 | $3.00 |
| TUERCA GALV. 3/8" | TUERCA GALVANIZADA DE 3/8" | PZA | 2.000000 | $0.35 | $0.70 |
| ROLDANA DE 3/8" | ROLDANA DE 3/8" | PZA | 2.000000 | $0.20 | $0.40 |
| Suma de Material | $2,114.26 | ||||
| Mano de Obra | |||||
| CUAD INST ESPECIAL | CUADRILLA DE INSTALACIONES ESPECIALES | Jor. | 0.166670 | $1,643.42 | $273.91 |
| Suma de Mano de Obra | $273.91 | ||||
| Costo Directo | $2,388.17 |