| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| PINTUB02 | PARA TUBERIA DE 19 MM. DE DIAMETRO | M |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| PINTURA SHERWIN | PINTURA SHERWIN | LT | 0.040000 | $51.40 | $2.06 |
| THINER | THINER | LTO | 0.018000 | $14.50 | $0.26 |
| ESTOPA | ESTOPA | Kg. | 0.015000 | $25.00 | $0.38 |
| Suma de Material | $2.69 | ||||
| Mano de Obra | |||||
| CUADRILLA BAJA TENS | Cuadrilla No. 32 (1Of. Electricista,1 Ayudantes) | Jor | 0.014290 | $622.77 | $8.90 |
| Suma de Mano de Obra | $8.90 | ||||
| Costo Directo | $11.59 |