| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| ALB 01.2 | CASTILLO K-2 DE 30 X12 cm 4 VRS No. 3 Y ESTRIBOS No. 2 @ 15 cm | ML |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Auxiliar | |||||
| CASTILLO K2 | CASTILLO DE CONCRETO SECCION= 12 X 30 CM, (ESPESOR X ANCHO) CONCRETO F'C=150 KG/CM2-3/4", CIMBRA 2 CARAS REFORZADO CON 4 VARILLAS R.N. DE 3/8" ESTRIBOS DE 1/4" A/C 15 CM | ml | 1.000000 | $150.95 | $150.95 |
| Suma de Auxiliar | $150.95 | ||||
| Costo Directo | $150.95 |