| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| TOR-005. | PLANTILLA DE CONCRETO F'C=150 KG/CM2, DE 5 CMS DE ESPESOR, PREMEZCLADA EN CIMENTACION, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMEINTA Y EQUIPO (P.U.O.T). | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CONC.150 KG/CM2 PREM | tiro directo rev.8-11 | m3 | 0.052500 | $690.00 | $36.23 |
| CONC.150 KG/CM2 PREM | tiro directo rev.8-11 | m3 | 0.052500 | $690.00 | $36.23 |
| CONC.150 KG/CM2 PREM | tiro directo rev.8-11 | m3 | 0.052500 | $690.00 | $36.23 |
| CONC.150 KG/CM2 PREM | tiro directo rev.8-11 | m3 | 0.052500 | $690.00 | $36.23 |
| MADERA-2 | MADERA DE PINO DE 3A. EN BARROTE DE 2" X 4" | PT | 0.500000 | $7.00 | $3.50 |
| MADERA-2 | MADERA DE PINO DE 3A. EN BARROTE DE 2" X 4" | PT | 0.500000 | $7.00 | $3.50 |
| MADERA-2 | MADERA DE PINO DE 3A. EN BARROTE DE 2" X 4" | PT | 0.500000 | $7.00 | $3.50 |
| MADERA-2 | MADERA DE PINO DE 3A. EN BARROTE DE 2" X 4" | PT | 0.500000 | $7.00 | $3.50 |
| CLAVO (VARIAS MED.) | CLAVO DE ACERO AL CARBON DE 2" A 4" | KG | 0.020000 | $17.00 | $0.34 |
| CLAVO (VARIAS MED.) | CLAVO DE ACERO AL CARBON DE 2" A 4" | KG | 0.020000 | $17.00 | $0.34 |
| CLAVO (VARIAS MED.) | CLAVO DE ACERO AL CARBON DE 2" A 4" | KG | 0.020000 | $17.00 | $0.34 |
| CLAVO (VARIAS MED.) | CLAVO DE ACERO AL CARBON DE 2" A 4" | KG | 0.020000 | $17.00 | $0.34 |
| ALAMBRE REC | ALAMBRE RECOCIDO CAL. 18 | KG | 0.100000 | $13.00 | $1.30 |
| ALAMBRE REC | ALAMBRE RECOCIDO CAL. 18 | KG | 0.100000 | $13.00 | $1.30 |
| ALAMBRE REC | ALAMBRE RECOCIDO CAL. 18 | KG | 0.100000 | $13.00 | $1.30 |
| ALAMBRE REC | ALAMBRE RECOCIDO CAL. 18 | KG | 0.100000 | $13.00 | $1.30 |
| Suma de Material | $165.46 | ||||
| Mano de Obra | |||||
| CUADRILLA NO.06 | (1 OFICIAL ALBAÑIL + 1 PEON) | JOR | 0.040000 | $647.98 | $25.92 |
| CUADRILLA NO.06 | (1 OFICIAL ALBAÑIL + 1 PEON) | JOR | 0.040000 | $647.98 | $25.92 |
| CUADRILLA NO.06 | (1 OFICIAL ALBAÑIL + 1 PEON) | JOR | 0.040000 | $647.98 | $25.92 |
| CUADRILLA NO.06 | (1 OFICIAL ALBAÑIL + 1 PEON) | JOR | 0.040000 | $647.98 | $25.92 |
| Suma de Mano de Obra | $103.68 | ||||
| Costo Directo | $269.14 |