| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| EST-04 | CIMBRA Y DESCIMBRA EN COLUMNAS DE ESTRUCTURA DE CONCRETO A CUALQUIER NIVEL ACABADO APARENTE, INCLUYE, MATERIALES, CHAFLANES, ALAMBRE RECOCIDO, DESMOLDANTE, SEPARADORES, FLETE A OBRA, ANDAMIOS, CALZAS, DESPERDICIO, ACARREO HASTA EL LUGAR DE SU UTILIZACIÓN, HABILITADO, COLOCACIÓN, LIMPIEZA Y RETIRO DE SOBRANTE FUERA DE LA OBRA, RECUPERACIÓN A FAVOR DEL CONTRATISTA, EQUIPO, HERRAMIENTA, Y MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA COLOCACION P.U.O.T. | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| OC-MAD5 | DUELA MADERA DE PINO 1"x4"x8' | pza | 0.140500 | $16.02 | $2.25 |
| OC-MAD5 | DUELA MADERA DE PINO 1"x4"x8' | pza | 0.140500 | $16.02 | $2.25 |
| OC-MAD5 | DUELA MADERA DE PINO 1"x4"x8' | pza | 0.140500 | $16.02 | $2.25 |
| OC-MAD6 | POLIN MADERA DE PINO 4"x4"x8' | pt | 1.500000 | $7.00 | $10.50 |
| OC-MAD6 | POLIN MADERA DE PINO 4"x4"x8' | pt | 1.500000 | $7.00 | $10.50 |
| OC-MAD6 | POLIN MADERA DE PINO 4"x4"x8' | pt | 1.500000 | $7.00 | $10.50 |
| OC-CLAVO | CLAVO DIFERENTES MEDIDAS | kg | 0.210000 | $15.00 | $3.15 |
| OC-CLAVO | CLAVO DIFERENTES MEDIDAS | kg | 0.210000 | $15.00 | $3.15 |
| OC-CLAVO | CLAVO DIFERENTES MEDIDAS | kg | 0.210000 | $15.00 | $3.15 |
| OC-MAD3 | CHAFLAN DE MADERA DE PINO DE 3A. DE 1" | pza | 0.670000 | $4.00 | $2.68 |
| OC-MAD3 | CHAFLAN DE MADERA DE PINO DE 3A. DE 1" | pza | 0.670000 | $4.00 | $2.68 |
| OC-MAD3 | CHAFLAN DE MADERA DE PINO DE 3A. DE 1" | pza | 0.670000 | $4.00 | $2.68 |
| OC-COMB1 | DIESEL | lt | 0.550000 | $7.93 | $4.36 |
| OC-COMB1 | DIESEL | lt | 0.550000 | $7.93 | $4.36 |
| OC-COMB1 | DIESEL | lt | 0.550000 | $7.93 | $4.36 |
| OC-ACERO REF5 | ALAMBRE RECOCIDO | kg | 0.150500 | $14.90 | $2.24 |
| OC-ACERO REF5 | ALAMBRE RECOCIDO | kg | 0.150500 | $14.90 | $2.24 |
| OC-ACERO REF5 | ALAMBRE RECOCIDO | kg | 0.150500 | $14.90 | $2.24 |
| OC-MAD4 | TRIPLAY DE PINO DE 16 MM 1 CARA DE 1.22 X 2.44 M. | m2 | 0.085383 | $310.00 | $26.47 |
| OC-MAD4 | TRIPLAY DE PINO DE 16 MM 1 CARA DE 1.22 X 2.44 M. | m2 | 0.085383 | $310.00 | $26.47 |
| OC-MAD4 | TRIPLAY DE PINO DE 16 MM 1 CARA DE 1.22 X 2.44 M. | m2 | 0.085383 | $310.00 | $26.47 |
| OC-ACERO REF3 | VARILLA FY=4200 KG/CM2 NO. 6 ( 3/4" ) | ton | 0.000450 | $8,500.00 | $3.83 |
| OC-ACERO REF3 | VARILLA FY=4200 KG/CM2 NO. 6 ( 3/4" ) | ton | 0.000450 | $8,500.00 | $3.83 |
| OC-ACERO REF3 | VARILLA FY=4200 KG/CM2 NO. 6 ( 3/4" ) | ton | 0.000450 | $8,500.00 | $3.83 |
| Suma de Material | $166.44 | ||||
| Mano de Obra | |||||
| OC-CUA32 | Cuadrilla (1 Carpintero + 1 Ayudante) | jor | 0.142857 | $918.72 | $131.25 |
| OC-CUA32 | Cuadrilla (1 Carpintero + 1 Ayudante) | jor | 0.142857 | $918.72 | $131.25 |
| OC-CUA32 | Cuadrilla (1 Carpintero + 1 Ayudante) | jor | 0.142857 | $918.72 | $131.25 |
| Suma de Mano de Obra | $393.74 | ||||
| Auxiliar | |||||
| OC-AUX12 | TORRE DE TRABAJO DE 0.00 A 4.00 MTS. DE ALTURA CON RUEDAS | R/D | 0.007170 | $31.38 | $0.22 |
| OC-AUX12 | TORRE DE TRABAJO DE 0.00 A 4.00 MTS. DE ALTURA CON RUEDAS | R/D | 0.007170 | $31.38 | $0.22 |
| OC-AUX12 | TORRE DE TRABAJO DE 0.00 A 4.00 MTS. DE ALTURA CON RUEDAS | R/D | 0.007170 | $31.38 | $0.22 |
| Suma de Auxiliar | $0.67 | ||||
| Costo Directo | $560.85 |