| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| IH-12 | SUMINISTRO E INSTALACIÓN DE TUBO CPVC DE 25 MM LÍNEA FLOWGUARD GOLD, MARCA DURMAN. INCLUYE: CONEXIONES DE CPVC COMO CODOS, TEE, REDUCCIONES, TRAZO, PASO EN TRABES, PRUEBAS HIDRÁULICAS, MANO DE OBRA CALIFICADA Y HERRAMIENTA MENOR. | ML |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| TEE CPVC 32MM | TEE DE CPVC FLOWGUARD GOLD DE 32MM DE DIAMETRO. | PZA | 0.111111 | $31.24 | $3.47 |
| CODO CPVC F.G. 90X32 | CODO CPVC FLOWGUARD GOLD DE 90 X 32MM | PZA | 0.050000 | $15.85 | $0.79 |
| CODO CPVC F.G. 45X32 | CODO CPVC FLOWGUARD GOLD DE 45 X 32MM | PZA | 0.066667 | $19.91 | $1.33 |
| COPLE CPVC F.G. 32MM | COPLE CPVC FLOWGUARD GOLD PARA CEMENTAR DE 32MM | PZA | 0.333333 | $10.36 | $3.45 |
| SEGUETAD/STAN | SEGUETA DIENTE STANDARD | PZA | 0.066667 | $8.50 | $0.57 |
| PEG. FLOWGUARD GOLD | PEGAMENTO FLOWGUARD GOLD DE 1/2 LTS | PZA | 0.050000 | $60.36 | $3.02 |
| LIJAESMERILFINA | LIJA DE ESMERIL FINA | PZA | 0.067890 | $14.50 | $0.98 |
| ESTOPA | ESTOPA | KG | 0.040000 | $18.00 | $0.72 |
| RED.BUS.CPVC 32X19MM | REDUCCION BUSHING DE CPVC FLOWGUARD GOLD DE 32X19 MM DE DIAMETRO. | PZA | 0.222222 | $8.41 | $1.87 |
| TUBO F.G. CPVC 25MM | TUBO DE CPVC FLOWGUARD GOLD DE 25MM DE DIAMETRO. | ML | 1.100000 | $30.92 | $34.01 |
| Suma de Material | $50.21 | ||||
| Mano de Obra | |||||
| CUADRILLA INST. 03 | Cuadrilla de ayudantes (2 ayudantes) para ranuras, demoliciones y acarreos | Jor | 0.010000 | $880.90 | $8.81 |
| CUADRILLA INST. 01 | Cuadrilla de plomeros ( Plomero + ayudante) | Jor | 0.045163 | $1,110.57 | $50.16 |
| Suma de Mano de Obra | $58.97 | ||||
| Costo Directo | $109.18 |