| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 6.8.3 | SUMINISTRO E INSTALACION DE REDUCCION BUSH. 3X2" C-40 CEM | PZA |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| 0309210 | REDUC. HID CEM. BUSH. 75- 50 MM. | PZ | 1.000000 | $54.59 | $54.59 |
| 9700130 | LIMPIADOR REXOLIT .500 LTS. | PZ | 0.160000 | $8.82 | $1.41 |
| 9700254 | CEMENTO AGRICOLA 480 ML | PZ | 0.255000 | $24.80 | $6.32 |
| Suma de Material | $62.33 | ||||
| Mano de Obra | |||||
| 1I1EI | CUADRILLA No.24 (1.00 OF. INST.+ 1.00 AY.ESP.) | jor | 0.010240 | $749.35 | $7.67 |
| Suma de Mano de Obra | $7.67 | ||||
| Herramienta | |||||
| FACHEME | Herramienta menor | (%)mo | 0.030000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Equipo | |||||
| AMAPE-039INS2 | CAMIONETA PICK UP MCA NISSAN | hora | 0.004820 | $164.54 | $0.79 |
| Suma de Equipo | $0.79 | ||||
| Costo Directo | $70.79 |