| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| REGISTRO2 | RECIBIR MARCO Y CONTRAMARCO DE 80X80 GALVANIZADO INCLUYE COLADO Y CIMBRADO DE LOSA YA QUE EL REGISTRO ACTUALMENTE ES DE 1.20 X1.20, RECIBIR MARCO Y CONTRAMARCO Y COLADO DE TAPA (SUMINISTRO Y GALVANIZADO) | PZA |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| MALLA 6/6 10-10 | MALLA ELECTROSOLDADA 6/6 10-10 | M2 | 1.440000 | $15.74 | $22.67 |
| GALVANIZADO | GALVANIZADO POR INMERSION | KG | 21.350000 | $8.00 | $170.80 |
| MARCO3 | MARCO Y CONTRAMARCO DE .80X.80 | PIEZA | 1.000000 | $265.00 | $265.00 |
| CIMBRAPLAY16MM | CIMBRAPLAY 16MM | M2 | 0.280000 | $96.00 | $26.88 |
| MADERA PINO BARROTE | MADERA DE PINO DE 3A. EN BARROTE DE 2" X 4" | PT | 2.112000 | $5.61 | $11.85 |
| Suma de Material | $497.19 | ||||
| Mano de Obra | |||||
| CUADRILLA NO. 13 | (1 Of. Albanil + 5 Peones) | jor | 0.066667 | $1,935.14 | $129.01 |
| Suma de Mano de Obra | $129.01 | ||||
| Auxiliar | |||||
| CONCRETO F-C=200 H/O | CONCRETO H.O. F'C=200 KG/CM2, R.N. AGR. MAX. 3/4" | M3 | 0.144000 | $1,084.42 | $156.16 |
| Suma de Auxiliar | $156.16 | ||||
| Costo Directo | $782.36 |