| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| OC04-010-010 | FIRME DE CONCRETO SIMPLE F`C=150 KG/CM2 DE 15 CM. DE ESPESOR | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| MALLA-LAC | MALLA ELECTROSOLDADA 6X6-10/10 | M2 | 1.100000 | $20.00 | $22.00 |
| MALLA-LAC | MALLA ELECTROSOLDADA 6X6-10/10 | M2 | 1.100000 | $20.00 | $22.00 |
| MALLA-LAC | MALLA ELECTROSOLDADA 6X6-10/10 | M2 | 1.100000 | $20.00 | $22.00 |
| ALAMBRE REC. | ALAMBRE RECOCIDO | kg | 0.010000 | $14.55 | $0.15 |
| ALAMBRE REC. | ALAMBRE RECOCIDO | kg | 0.010000 | $14.55 | $0.15 |
| ALAMBRE REC. | ALAMBRE RECOCIDO | kg | 0.010000 | $14.55 | $0.15 |
| Suma de Material | $66.44 | ||||
| Mano de Obra | |||||
| CUADRILLA NO. 02 | CUADRILLA ( 1 OF. ALBAÑIL+1 AYUDANTE) | Jor | 0.100000 | $594.28 | $59.43 |
| CUADRILLA NO. 02 | CUADRILLA ( 1 OF. ALBAÑIL+1 AYUDANTE) | Jor | 0.100000 | $594.28 | $59.43 |
| CUADRILLA NO. 02 | CUADRILLA ( 1 OF. ALBAÑIL+1 AYUDANTE) | Jor | 0.100000 | $594.28 | $59.43 |
| Suma de Mano de Obra | $178.28 | ||||
| Auxiliar | |||||
| CONCRETO 150 | CONCRETO HECHO EN OBRA F'C=150 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 1 1/2" | M3 | 0.160000 | $1,066.91 | $170.71 |
| CONCRETO 150 | CONCRETO HECHO EN OBRA F'C=150 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 1 1/2" | M3 | 0.160000 | $1,066.91 | $170.71 |
| CONCRETO 150 | CONCRETO HECHO EN OBRA F'C=150 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 1 1/2" | M3 | 0.160000 | $1,066.91 | $170.71 |
| Suma de Auxiliar | $512.12 | ||||
| Costo Directo | $756.84 |