| Clave | Descripci贸n | Unidad | Cantidad | Costo | Importe |
| Material | | | | |
| TAP-REG-001 | MARCO Y CONTRAMARCO HECHO A BASE DE ANGULO DE 2" Y REFORZADO CON ALAMBRON | pieza | 0.700000 | $650.00 | $455.00 |
| TAP-REG-001 | MARCO Y CONTRAMARCO HECHO A BASE DE ANGULO DE 2" Y REFORZADO CON ALAMBRON | pieza | 0.700000 | $650.00 | $455.00 |
| Suma de Material | | | | $910.00 |
| Mano de Obra | | | | |
| CUADRILLA NO 004 | CUADRILLA No 41 ( 1 ALBA脩IL + 1 PEON ) | jor | 0.500000 | $687.38 | $343.69 |
| CUADRILLA NO 004 | CUADRILLA No 41 ( 1 ALBA脩IL + 1 PEON ) | jor | 0.500000 | $687.38 | $343.69 |
| Suma de Mano de Obra | | | | $687.38 |
| Auxiliar | | | | |
| EXC MNO | EXCAVACION A MANO EN MATERIAL TIPO B (TEPETATE) A UNA PROFUNDIDAD MAXIMA DE 2.00 MTS INCLUYE ACARREO A PRIMERA ESTACION EN CARRETILLA | m3 | 0.660000 | $92.06 | $60.76 |
| EXC MNO | EXCAVACION A MANO EN MATERIAL TIPO B (TEPETATE) A UNA PROFUNDIDAD MAXIMA DE 2.00 MTS INCLUYE ACARREO A PRIMERA ESTACION EN CARRETILLA | m3 | 0.660000 | $92.06 | $60.76 |
| PLANTILLA | PLANTILLA DE CONCRETO F'C = 100 KG/CM2, HECHO EN OBRA, RESISTENCIA NORMAL, DE 5 CM. DE ESP. | m2 | 0.630000 | $84.61 | $53.30 |
| PLANTILLA | PLANTILLA DE CONCRETO F'C = 100 KG/CM2, HECHO EN OBRA, RESISTENCIA NORMAL, DE 5 CM. DE ESP. | m2 | 0.630000 | $84.61 | $53.30 |
| Suma de Auxiliar | | | | $228.13 |
| Concepto | | | | |
| 1.6.1.3 | MURO DE BLOCK DE CONCRETO LIGERO DE 15 X 20 X 40 CM EN 15 CM DE ESPESOR ASENTADO CON MORTERO CEMENTO-ARENA 1:4, JUNTAS DE 1.5 CM ACABADO COMUN HASTA 4.00 mts. DE ALTURA MAXIMA; INCLUYE REFUERZO HORIZONTAL DE ESCALERILLA A CADA 2 HILADAS, MATERIALES DE CONSUMO, TORRE DE TRABAJO, COSTO POR MANO DE OBRA, EQUIPO Y HERRAMIENTA. | m2 | 3.200000 | $160.23 | $512.74 |
| 1.6.1.3 | MURO DE BLOCK DE CONCRETO LIGERO DE 15 X 20 X 40 CM EN 15 CM DE ESPESOR ASENTADO CON MORTERO CEMENTO-ARENA 1:4, JUNTAS DE 1.5 CM ACABADO COMUN HASTA 4.00 mts. DE ALTURA MAXIMA; INCLUYE REFUERZO HORIZONTAL DE ESCALERILLA A CADA 2 HILADAS, MATERIALES DE CONSUMO, TORRE DE TRABAJO, COSTO POR MANO DE OBRA, EQUIPO Y HERRAMIENTA. | m2 | 3.200000 | $160.23 | $512.74 |
| EXT-13A | APLANADO FINO CON MORTERO CEMENTO-ARENA 1:3 A PLOMO Y REGLA EN MUROS DE BARDA EXISTENTE CON ESPESOR PROMEDIO DE 3 CM. INCLUYE ANDAMIOS,MATERIALES Y MANO DE OBRA. | m2 | 2.000000 | $97.09 | $194.18 |
| EXT-13A | APLANADO FINO CON MORTERO CEMENTO-ARENA 1:3 A PLOMO Y REGLA EN MUROS DE BARDA EXISTENTE CON ESPESOR PROMEDIO DE 3 CM. INCLUYE ANDAMIOS,MATERIALES Y MANO DE OBRA. | m2 | 2.000000 | $97.09 | $194.18 |
| 010704 | RELLENO COMPACTADO CON APIZONADOR VIBRATORIO (BAILARINA) CEPAS DE 20 CM. UTILIZANDO MATERIAL PRODUCTO DE LA OBRA.; INCLUYE: RENTA DE EQUIPO, COSTO POR MANO DE OBRA Y HERRAMIENTA. NO INCLUYE ACARREO DEL MATERIAL DE RELLENO. | m3 | 0.640000 | $127.48 | $81.59 |
| 010704 | RELLENO COMPACTADO CON APIZONADOR VIBRATORIO (BAILARINA) CEPAS DE 20 CM. UTILIZANDO MATERIAL PRODUCTO DE LA OBRA.; INCLUYE: RENTA DE EQUIPO, COSTO POR MANO DE OBRA Y HERRAMIENTA. NO INCLUYE ACARREO DEL MATERIAL DE RELLENO. | m3 | 0.640000 | $127.48 | $81.59 |
| 1.8.27 | SUMINISTRO Y APLICACION DE PINTURA PRIMARIO ANTICORROSIVO ROJO OXIDO MCA DUPONT. | kg | 12.000000 | $1.37 | $16.44 |
| 1.8.27 | SUMINISTRO Y APLICACION DE PINTURA PRIMARIO ANTICORROSIVO ROJO OXIDO MCA DUPONT. | kg | 12.000000 | $1.37 | $16.44 |
| Suma de Concepto | | | | $1,609.89 |
| Costo Directo | | | | $3,435.39 |