| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 22 | CISTERNA DE 120 x 120 x 140 CM, (D-431-01-4-4600) | Pza |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| LI11/2X1/4 | ANGULO LI DE ACERO AL CARBON DE 1 1/2" X 1/4" ASTM-A-36 | KG | 9.180000 | $8.16 | $74.91 |
| LI11/4X1/4 | ANGULO LI DE ACERO AL CARBON DE 1 1/4" X 1/4" ASTM-A-36 | KG | 7.550000 | $8.16 | $61.61 |
| REDONDO LISO #3 | ANCLA DE ACERO REDONDO LISO # 3 | KG | 0.394000 | $8.16 | $3.22 |
| TUBO PVC 2" | TUBO DE P.V.C. SANITARIO LISO PARA CEMENTAR DE 2" DE DIAM. MARCA DURALON | ml | 0.400000 | $8.16 | $3.26 |
| CODO PVC 2" | CODO DE PVC 2" 90° | PZA | 2.000000 | $39.55 | $79.10 |
| MAT-CON004 | SOLDADURA NOM H-77 AWS E-6010, 7018 | KG | 0.513720 | $19.18 | $9.85 |
| CON-005A | ARENA SILICA MALLA 16/30 (TON) | TON | 0.042810 | $741.54 | $31.75 |
| PIN001 | PRIMARIO INORGANICO DE ZINC RP-4 TIPO "B" | LT | 0.171240 | $121.57 | $20.82 |
| PIN012 | ACABADO RA-26 | LT | 0.205488 | $143.89 | $29.57 |
| MA-307 | THINNER | LT | 0.102744 | $11.96 | $1.23 |
| MAT-CON001 | OXIGENO | M3 | 0.171240 | $37.41 | $6.41 |
| MAT-CON002 | ACETILENO | KG | 0.085620 | $133.34 | $11.42 |
| MAT-CON003 | DISCO ABRASIVO DE 1/4" | PZA | 0.030000 | $57.55 | $1.73 |
| Suma de Material | $334.86 | ||||
| Mano de Obra | |||||
| CUAD014 | CUADRILLA OPERARIO ESPECIALISTA SOLDADOR + AYUDANTE | jor | 0.042810 | $832.18 | $35.63 |
| CUAD036 | CUADRILLA OPERARIO ESPECIALISTA PAILERO + AYUDANTE | jor | 0.042810 | $832.18 | $35.63 |
| CUAD016 | CUADRILLA OPERARIO ESPECIALISTA PINTOR + AYUDANTE | jor | 0.042810 | $819.83 | $35.10 |
| Suma de Mano de Obra | $106.35 | ||||
| Herramienta | |||||
| %MO01 | HERRAMIENTA MENOR | (%)mo | 0.040000 | $0.00 | $0.00 |
| %MO02 | EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Equipo | |||||
| MAQ031 | EQUIPO PARA SOLDURA Y CORTE | hora | 0.428100 | $62.95 | $26.95 |
| MAQ053 | EQUIPO PARA PINTURA | hora | 0.428100 | $135.43 | $57.98 |
| Suma de Equipo | $84.93 | ||||
| Auxiliar | |||||
| CONF-C=250KG/CM2.IM | CONCRETO HECHO EN OBRA F'C=250 KG/CM2. RESISTENCIA NORMAL, AGREGADO MAXIMO DE 3/4" | M3 | 0.687600 | $1,568.24 | $1,078.32 |
| VACIADO | VACIADO DE CONCRETO CON BOTES O CARRETILLA Y ACARREO HASTA 50 M. | M3 | 2.267600 | $134.17 | $304.24 |
| CONC. F-C=100KG/CM2. | CONCRETO HECHO EN OBRA F'C=100 KG/CM2. AGREGADO MAXIMO DE 3/4". | M3 | 1.580000 | $950.72 | $1,502.14 |
| EXCAVACION | EXCAVACION CON EQUIPO PESADO | M3 | 2.016000 | $36.03 | $72.64 |
| ACERO REFZO NO. 3 | HABILITADO Y ARMADO DE ACERO DE REFUERZO FY=4200 KG/CM2. DEL No. 3 ( 3/8" ) DE DIAM. | TON | 0.081240 | $9,192.72 | $746.82 |
| CIMBRA COMUN CIMENTA | CIMBRA COMUN DE MADERA DE PINO DE 2da. | M2 | 6.720000 | $151.18 | $1,015.93 |
| SUCCION DE CISTERNA | DETALLE PARA SUCCION DE CISTERNA | PZA | 1.000000 | $225.64 | $225.64 |
| ACABADO | ACABADO PULIDO INTEGRAL A PLANA METALICA SOBRE FIRME DE CONCRETO CON POLVOREADO CON CEMENTO GRIS | M2 | 8.160000 | $35.22 | $287.40 |
| Suma de Auxiliar | $5,233.12 | ||||
| Costo Directo | $5,759.25 |