| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 21 | CISTERNA DE 330 X 330 X 240 CM, (D-431.01-4-4755) | Pza |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| LI11/2X1/4 | ANGULO LI DE ACERO AL CARBON DE 1 1/2" X 1/4" ASTM-A-36 | KG | 37.900000 | $8.16 | $309.26 |
| LI11/4X1/4 | ANGULO LI DE ACERO AL CARBON DE 1 1/4" X 1/4" ASTM-A-36 | KG | 31.145400 | $8.16 | $254.15 |
| REDONDO LISO #3 | ANCLA DE ACERO REDONDO LISO # 3 | KG | 4.880000 | $8.16 | $39.82 |
| REDONDO LISO #5 | ACERO REDONDO LISO # 5 | KG | 16.400000 | $8.16 | $133.82 |
| MAT-CON004 | SOLDADURA NOM H-77 AWS E-6010, 7018 | KG | 2.709600 | $19.18 | $51.97 |
| CON-005A | ARENA SILICA MALLA 16/30 (TON) | TON | 0.225800 | $741.54 | $167.44 |
| PIN001 | PRIMARIO INORGANICO DE ZINC RP-4 TIPO "B" | LT | 0.903200 | $121.57 | $109.80 |
| PIN012 | ACABADO RA-26 | LT | 1.083840 | $143.89 | $155.95 |
| MA-307 | THINNER | LT | 0.541920 | $11.96 | $6.48 |
| MAT-CON001 | OXIGENO | M3 | 0.903200 | $37.41 | $33.79 |
| MAT-CON002 | ACETILENO | KG | 0.451600 | $133.34 | $60.22 |
| MAT-CON003 | DISCO ABRASIVO DE 1/4" | PZA | 1.000000 | $57.55 | $57.55 |
| Suma de Material | $1,380.26 | ||||
| Mano de Obra | |||||
| CUAD014 | CUADRILLA OPERARIO ESPECIALISTA SOLDADOR + AYUDANTE | jor | 0.036128 | $832.18 | $30.06 |
| CUAD036 | CUADRILLA OPERARIO ESPECIALISTA PAILERO + AYUDANTE | jor | 0.036130 | $832.18 | $30.07 |
| CUAD016 | CUADRILLA OPERARIO ESPECIALISTA PINTOR + AYUDANTE | jor | 0.036130 | $819.83 | $29.62 |
| Suma de Mano de Obra | $89.75 | ||||
| Herramienta | |||||
| %MO01 | HERRAMIENTA MENOR | (%)mo | 0.040000 | $0.00 | $0.00 |
| %MO02 | EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Equipo | |||||
| MAQ031 | EQUIPO PARA SOLDURA Y CORTE | hora | 0.361300 | $62.95 | $22.74 |
| MAQ053 | EQUIPO PARA PINTURA | hora | 0.361300 | $135.43 | $48.93 |
| Suma de Equipo | $71.67 | ||||
| Auxiliar | |||||
| CONF-C=250KG/CM2.IM | CONCRETO HECHO EN OBRA F'C=250 KG/CM2. RESISTENCIA NORMAL, AGREGADO MAXIMO DE 3/4" | M3 | 8.932000 | $1,568.24 | $14,007.52 |
| VACIADO | VACIADO DE CONCRETO CON BOTES O CARRETILLA Y ACARREO HASTA 50 M. | M3 | 9.722000 | $134.17 | $1,304.40 |
| CONC. F-C=100KG/CM2. | CONCRETO HECHO EN OBRA F'C=100 KG/CM2. AGREGADO MAXIMO DE 3/4". | M3 | 0.790000 | $950.72 | $751.07 |
| EXCAVACION | EXCAVACION CON EQUIPO PESADO | M3 | 26.136000 | $36.03 | $941.68 |
| ACERO REFZO NO. 3 | HABILITADO Y ARMADO DE ACERO DE REFUERZO FY=4200 KG/CM2. DEL No. 3 ( 3/8" ) DE DIAM. | TON | 0.669960 | $9,192.72 | $6,158.75 |
| ACERO REFZO NO. 4 | HABILITADO Y ARMADO DE ACERO DE REFUERZO FY=4200 KG/CM2. DEL No. 4 ( 1/2" ) DE DIAM. | TON | 0.007700 | $9,192.72 | $70.78 |
| CIMBRA COMUN CIMENTA | CIMBRA COMUN DE MADERA DE PINO DE 2da. | M2 | 83.160000 | $151.18 | $12,572.13 |
| ACABADO | ACABADO PULIDO INTEGRAL A PLANA METALICA SOBRE FIRME DE CONCRETO CON POLVOREADO CON CEMENTO GRIS | M2 | 54.460000 | $35.22 | $1,918.08 |
| Suma de Auxiliar | $37,724.42 | ||||
| Costo Directo | $39,266.10 |