| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 199 | SUMINISTRO Y FABRICACIÓN DE CARCAMO RECOLECTOR DE AGUAS ACEITOSA Y PLUVIAL DE CONCRETO ARMADO, DE 950 x 1250 X 450 cm DE ALTURA, INCLUYE: EXCAVACIÓN, RELLENO, PLANTILLA, ACERO DE REFUERZO, CIMBRADO Y DESCIMBRADO, CONCRETO CON IMPERMEABILIZANTE INTEGRAL, VACIADO, VIBRADO Y CURADO, DE ACUERDO A PLANO (D-431.01-4-4865) | Pza |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| REJILLA IRVING | REJILLA TIPO IRVING CON SOLERA DE CARGA DE 5X32 mm | m2 | 43.736000 | $719.45 | $31,465.87 |
| REDONDO LISO #5 | ACERO REDONDO LISO # 5 | KG | 77.220000 | $8.16 | $630.12 |
| LI2X1/4 | ANGULO LI DE ACERO AL CARBON DE 2" X 1/4" ASTM-A-36 | KG | 189.667500 | $8.16 | $1,547.69 |
| PLACA 3/8" | PLACA DE ACERO AL CARBON ASTM-A-36 DE 3/8" | KG | 299.475000 | $8.16 | $2,443.72 |
| MAT-CON004 | SOLDADURA NOM H-77 AWS E-6010, 7018 | KG | 16.976610 | $19.18 | $325.61 |
| CON-005A | ARENA SILICA MALLA 16/30 (TON) | TON | 1.414718 | $741.54 | $1,049.07 |
| MAT-CON001 | OXIGENO | M3 | 5.658870 | $37.41 | $211.70 |
| MAT-CON002 | ACETILENO | KG | 2.829435 | $133.34 | $377.28 |
| MAT-CON003 | DISCO ABRASIVO DE 1/4" | PZA | 1.131774 | $57.55 | $65.13 |
| PIN001 | PRIMARIO INORGANICO DE ZINC RP-4 TIPO "B" | LT | 5.658870 | $121.57 | $687.95 |
| PIN012 | ACABADO RA-26 | LT | 6.790644 | $143.89 | $977.11 |
| MA-307 | THINNER | LT | 3.395322 | $11.96 | $40.61 |
| Suma de Material | $39,821.84 | ||||
| Mano de Obra | |||||
| CUAD014 | CUADRILLA OPERARIO ESPECIALISTA SOLDADOR + AYUDANTE | jor | 1.414718 | $832.18 | $1,177.30 |
| CUAD036 | CUADRILLA OPERARIO ESPECIALISTA PAILERO + AYUDANTE | jor | 1.414718 | $832.18 | $1,177.30 |
| CUAD017 | CUADRILLA SAND BLASTERO-PINTOR + AYUDANTE | jor | 1.414718 | $832.18 | $1,177.30 |
| Suma de Mano de Obra | $3,531.90 | ||||
| Herramienta | |||||
| %MO01 | HERRAMIENTA MENOR | (%)mo | 0.040000 | $0.00 | $0.00 |
| %MO02 | EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Equipo | |||||
| MAQ031 | EQUIPO PARA SOLDURA Y CORTE | hora | 14.147200 | $62.95 | $890.57 |
| MAQ012 | EQUIPO PARA SAND BLAST Y PINTURA | hora | 14.147200 | $141.60 | $2,003.24 |
| Suma de Equipo | $2,893.81 | ||||
| Auxiliar | |||||
| CONF-C=250KG/CM2.IM | CONCRETO HECHO EN OBRA F'C=250 KG/CM2. RESISTENCIA NORMAL, AGREGADO MAXIMO DE 3/4" | M3 | 199.760000 | $1,568.24 | $313,271.62 |
| CONC. F-C=100KG/CM2. | CONCRETO HECHO EN OBRA F'C=100 KG/CM2. AGREGADO MAXIMO DE 3/4". | M3 | 8.998000 | $950.72 | $8,554.58 |
| VACIADO | VACIADO DE CONCRETO CON BOTES O CARRETILLA Y ACARREO HASTA 50 M. | M3 | 208.758000 | $134.17 | $28,009.06 |
| CIMBRA COMUN CIMENTA | CIMBRA COMUN DE MADERA DE PINO DE 2da. | M2 | 777.205000 | $151.18 | $117,497.85 |
| ACERO CIMEN. NO. 4 | HABILITADO Y ARMADO DE ACERO DE REFUERZO EN CIMENTACION FY=4200 KG/CM2. DEL No. 4 ( 1/2" ) DE DIAM. | TON | 0.049720 | $8,944.41 | $444.72 |
| ACERO CIMEN. NO. 5 | HABILITADO Y ARMADO DE ACERO DE REFUERZO EN CIMENTACION FY=4200 KG/CM2. DEL No. 5 ( 5/8" ) DE DIAM. | TON | 2.237664 | $8,564.97 | $19,165.53 |
| ACERO CIMEN. NO. 6 | HABILITADO Y ARMADO DE ACERO DE REFUERZO EN CIMENTACION FY=4200 KG/CM2. DEL No. 6 ( 3/4" ) DE DIAM. | TON | 9.124484 | $8,410.57 | $76,742.11 |
| ACERO CIMEN. NO. 8 | HABILITADO Y ARMADO DE ACERO DE REFUERZO EN CIMENTACION FY=4200 KG/CM2. DEL No. 8 ( 1" ) DE DIAM. | TON | 10.824474 | $8,143.28 | $88,146.72 |
| EXCAVACION | EXCAVACION CON EQUIPO PESADO | M3 | 736.200000 | $36.03 | $26,525.29 |
| RESPIRADERO | RESPIRADERO | PZA | 1.000000 | $385.59 | $385.59 |
| VIGETA IR-254X38.5 | SUMINISTRO Y HABILITADO DE VIGUETA DE ACERO IR DE 254 X 38.5 | TON | 0.872410 | $25,739.24 | $22,455.17 |
| CAMISA P/CRUCE | CAMISA PARA CRUCE DE TUBERIA | PZA | 1.000000 | $851.81 | $851.81 |
| REJILLA RETEN | REJILLA RETENEDORA | PZA | 1.000000 | $501.22 | $501.22 |
| ENTRADA HMBRE | TAPA Y CONTRAMARCO ENTRADA HOMBRE | PZA | 1.000000 | $1,383.45 | $1,383.45 |
| BASE P/BMBA | BASE PARA BOMBAS | PZA | 1.000000 | $1,256.89 | $1,256.89 |
| ACERO REFZO NO. 3 | HABILITADO Y ARMADO DE ACERO DE REFUERZO FY=4200 KG/CM2. DEL No. 3 ( 3/8" ) DE DIAM. | TON | 0.015100 | $9,192.72 | $138.81 |
| CIMBRA COMUN CIMENTA | CIMBRA COMUN DE MADERA DE PINO DE 2da. | M2 | 2.200000 | $151.18 | $332.60 |
| Suma de Auxiliar | $705,663.01 | ||||
| Costo Directo | $751,910.56 |