| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 11 | TUBERÍA DE 25 cm DE DIÁMETRO. (D-431-01-4-4040) | ml |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| TUBO CEM. 25 CMS | TUBO DE CONCRETO SIMPLE DE 25 CM DE DIAMETRO | ML | 1.100000 | $57.55 | $63.31 |
| CONS006 | CEMENTO GRIS PORTLAND | TON | 0.005000 | $1,671.17 | $8.36 |
| CONS002 | ARENA DE LA REGION | M3 | 0.100000 | $257.00 | $25.70 |
| CONS001 | AGUA PUESTA EN OBRA EN PIPA | M3 | 0.250000 | $19.77 | $4.94 |
| Suma de Material | $102.30 | ||||
| Mano de Obra | |||||
| CUAD039 | CUADRILLA OPERARIO ESPECIALISTA ALBAÑIL + AYUDANTE | jor | 0.071429 | $795.15 | $56.80 |
| Suma de Mano de Obra | $56.80 | ||||
| Herramienta | |||||
| %MO01 | HERRAMIENTA MENOR | (%)mo | 0.040000 | $0.00 | $0.00 |
| %MO02 | EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Auxiliar | |||||
| EXCAVACION | EXCAVACION CON EQUIPO PESADO | M3 | 0.300000 | $36.03 | $10.81 |
| Suma de Auxiliar | $10.81 | ||||
| Costo Directo | $169.91 |