| Clave | Descripci贸n | Unidad | Cantidad | Costo | Importe |
| Material | | | | |
| CPCPR050 | Concreto premez. f'c=250 kg/cm2 RN,tma= 20mm rev 14 clase 2 grd B bombeable | m3* | 0.126000 | $843.60 | $106.29 |
| CPCPR050 | Concreto premez. f'c=250 kg/cm2 RN,tma= 20mm rev 14 clase 2 grd B bombeable | m3* | 0.126000 | $843.60 | $106.29 |
| CPCPR050 | Concreto premez. f'c=250 kg/cm2 RN,tma= 20mm rev 14 clase 2 grd B bombeable | m3* | 0.126000 | $843.60 | $106.29 |
| CPCPR050 | Concreto premez. f'c=250 kg/cm2 RN,tma= 20mm rev 14 clase 2 grd B bombeable | m3* | 0.126000 | $843.60 | $106.29 |
| CPCPR050 | Concreto premez. f'c=250 kg/cm2 RN,tma= 20mm rev 14 clase 2 grd B bombeable | m3* | 0.126000 | $843.60 | $106.29 |
| CPCPR050 | Concreto premez. f'c=250 kg/cm2 RN,tma= 20mm rev 14 clase 2 grd B bombeable | m3* | 0.126000 | $843.60 | $106.29 |
| REVENIMIENTO | Revenimiento 14 +/- 3.5 cms | m3* | 0.126000 | $76.00 | $9.58 |
| REVENIMIENTO | Revenimiento 14 +/- 3.5 cms | m3* | 0.126000 | $76.00 | $9.58 |
| REVENIMIENTO | Revenimiento 14 +/- 3.5 cms | m3* | 0.126000 | $76.00 | $9.58 |
| REVENIMIENTO | Revenimiento 14 +/- 3.5 cms | m3* | 0.126000 | $76.00 | $9.58 |
| REVENIMIENTO | Revenimiento 14 +/- 3.5 cms | m3* | 0.126000 | $76.00 | $9.58 |
| REVENIMIENTO | Revenimiento 14 +/- 3.5 cms | m3* | 0.126000 | $76.00 | $9.58 |
| MBOM0010 | Bombeo concr.c/bomba est. 5o. nivel 15m. alt | m3* | 0.126000 | $114.00 | $14.36 |
| MBOM0010 | Bombeo concr.c/bomba est. 5o. nivel 15m. alt | m3* | 0.126000 | $114.00 | $14.36 |
| MBOM0010 | Bombeo concr.c/bomba est. 5o. nivel 15m. alt | m3* | 0.126000 | $114.00 | $14.36 |
| MBOM0010 | Bombeo concr.c/bomba est. 5o. nivel 15m. alt | m3* | 0.126000 | $114.00 | $14.36 |
| MBOM0010 | Bombeo concr.c/bomba est. 5o. nivel 15m. alt | m3* | 0.126000 | $114.00 | $14.36 |
| MBOM0010 | Bombeo concr.c/bomba est. 5o. nivel 15m. alt | m3* | 0.126000 | $114.00 | $14.36 |
| MALLA 66/100 | MALLA ELECTROSOLDADA 66 6/6 | M2* | 1.100000 | $37.36 | $41.10 |
| MALLA 66/100 | MALLA ELECTROSOLDADA 66 6/6 | M2* | 1.100000 | $37.36 | $41.10 |
| MALLA 66/100 | MALLA ELECTROSOLDADA 66 6/6 | M2* | 1.100000 | $37.36 | $41.10 |
| MALLA 66/100 | MALLA ELECTROSOLDADA 66 6/6 | M2* | 1.100000 | $37.36 | $41.10 |
| MALLA 66/100 | MALLA ELECTROSOLDADA 66 6/6 | M2* | 1.100000 | $37.36 | $41.10 |
| MALLA 66/100 | MALLA ELECTROSOLDADA 66 6/6 | M2* | 1.100000 | $37.36 | $41.10 |
| A4BAR012 | Alambre recocido | kg* | 0.010000 | $16.00 | $0.16 |
| A4BAR012 | Alambre recocido | kg* | 0.010000 | $16.00 | $0.16 |
| A4BAR012 | Alambre recocido | kg* | 0.010000 | $16.00 | $0.16 |
| A4BAR012 | Alambre recocido | kg* | 0.010000 | $16.00 | $0.16 |
| A4BAR012 | Alambre recocido | kg* | 0.010000 | $16.00 | $0.16 |
| A4BAR012 | Alambre recocido | kg* | 0.010000 | $16.00 | $0.16 |
| DUELA DE PINO | MADERA DE PINO DE 3A BARROTE | pt* | 1.500000 | $7.50 | $11.25 |
| DUELA DE PINO | MADERA DE PINO DE 3A BARROTE | pt* | 1.500000 | $7.50 | $11.25 |
| DUELA DE PINO | MADERA DE PINO DE 3A BARROTE | pt* | 1.500000 | $7.50 | $11.25 |
| DUELA DE PINO | MADERA DE PINO DE 3A BARROTE | pt* | 1.500000 | $7.50 | $11.25 |
| DUELA DE PINO | MADERA DE PINO DE 3A BARROTE | pt* | 1.500000 | $7.50 | $11.25 |
| DUELA DE PINO | MADERA DE PINO DE 3A BARROTE | pt* | 1.500000 | $7.50 | $11.25 |
| VAR020 | Varilla de acero corrugada 1/2" No. 4, marca Aceros San Luis | kg* | 0.150000 | $13.66 | $2.05 |
| VAR020 | Varilla de acero corrugada 1/2" No. 4, marca Aceros San Luis | kg* | 0.150000 | $13.66 | $2.05 |
| VAR020 | Varilla de acero corrugada 1/2" No. 4, marca Aceros San Luis | kg* | 0.150000 | $13.66 | $2.05 |
| VAR020 | Varilla de acero corrugada 1/2" No. 4, marca Aceros San Luis | kg* | 0.150000 | $13.66 | $2.05 |
| VAR020 | Varilla de acero corrugada 1/2" No. 4, marca Aceros San Luis | kg* | 0.150000 | $13.66 | $2.05 |
| VAR020 | Varilla de acero corrugada 1/2" No. 4, marca Aceros San Luis | kg* | 0.150000 | $13.66 | $2.05 |
| ACMXX005 | Agua | m3 | 0.021000 | $40.00 | $0.84 |
| ACMXX005 | Agua | m3 | 0.021000 | $40.00 | $0.84 |
| ACMXX005 | Agua | m3 | 0.021000 | $40.00 | $0.84 |
| ACMXX005 | Agua | m3 | 0.021000 | $40.00 | $0.84 |
| ACMXX005 | Agua | m3 | 0.021000 | $40.00 | $0.84 |
| ACMXX005 | Agua | m3 | 0.021000 | $40.00 | $0.84 |
| Suma de Material | | | | $1,113.77 |
| Mano de Obra | | | | |
| CUAD OC 05 | (1 Of. Alba帽il + 5 Peones) | jor | 0.030000 | $1,425.74 | $42.77 |
| CUAD OC 05 | (1 Of. Alba帽il + 5 Peones) | jor | 0.030000 | $1,425.74 | $42.77 |
| CUAD OC 05 | (1 Of. Alba帽il + 5 Peones) | jor | 0.030000 | $1,425.74 | $42.77 |
| CUAD OC 05 | (1 Of. Alba帽il + 5 Peones) | jor | 0.030000 | $1,425.74 | $42.77 |
| CUAD OC 05 | (1 Of. Alba帽il + 5 Peones) | jor | 0.030000 | $1,425.74 | $42.77 |
| CUAD OC 05 | (1 Of. Alba帽il + 5 Peones) | jor | 0.030000 | $1,425.74 | $42.77 |
| CUAD OC 62 | (1 Of. Fierrero + 1 Ayud.) | jor | 0.005500 | $634.41 | $3.49 |
| CUAD OC 62 | (1 Of. Fierrero + 1 Ayud.) | jor | 0.005500 | $634.41 | $3.49 |
| CUAD OC 62 | (1 Of. Fierrero + 1 Ayud.) | jor | 0.005500 | $634.41 | $3.49 |
| CUAD OC 62 | (1 Of. Fierrero + 1 Ayud.) | jor | 0.005500 | $634.41 | $3.49 |
| CUAD OC 62 | (1 Of. Fierrero + 1 Ayud.) | jor | 0.005500 | $634.41 | $3.49 |
| CUAD OC 62 | (1 Of. Fierrero + 1 Ayud.) | jor | 0.005500 | $634.41 | $3.49 |
| Suma de Mano de Obra | | | | $277.57 |
| Costo Directo | | | | $1,391.34 |