| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| II.4 | CONCRETO PREMEZCLADO F'C= 250 KG/CM2, TMA 3/4". INCLUYE: COLADO, BOMBEO, VIBRADO Y CURADO. (ZAPATA) | M3 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CONCRETO PREM 250 | CONCRETO PREMEZCLADO F'C= 250 KG/CM2, TMA 3/4" | M3 | 1.050000 | $1,000.00 | $1,050.00 |
| REVENIMIENTO | REVENIMIENTO PARA BOMBEO | M3 | 1.050000 | $130.00 | $136.50 |
| AGUA | AGUA | M3 | 0.050000 | $80.00 | $4.00 |
| BOMBEO CONC | bombeo de concreto con sistema estacionario o pluma elevada | m3 | 1.050000 | $160.00 | $168.00 |
| Suma de Material | $1,358.50 | ||||
| Mano de Obra | |||||
| C02-0450 | CUAD. No 45 ( 1 ALBAÑIL + 5 PEONES ) | JOR | 0.053210 | $2,901.49 | $154.39 |
| Suma de Mano de Obra | $154.39 | ||||
| Equipo | |||||
| API-VIBRADORCONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | Hora | 0.200000 | $25.22 | $5.04 |
| Suma de Equipo | $5.04 | ||||
| Auxiliar | |||||
| 020224A | CURADO DE CONCRETO CON EQUIPO DE ASPERSION Y CURAFES ROJO | m3 | 1.000000 | $27.76 | $27.76 |
| Suma de Auxiliar | $27.76 | ||||
| Costo Directo | $1,545.69 |