| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 2.2.1 1 | CASTILLO DE CONCRETO (K1)SECCION= 15 X 15 CM, CONCRETO F'C=150 KG/CM2-3/4", CIMBRA 2 CARAS, REFORZADO CON 4 VAR. 3/8" GALVANIZADO POR INMERSION EN CALIENTE | ML |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CONCRETO F-C=150 H/O | CONCRETO F'c=150 KG/CM2, HECHO EN OBRA AGREGADO MAXIMO GRAVILLA 3/4" | M3 | 0.024000 | $781.40 | $18.75 |
| ACERO | ACERO REF.VAR.DIAM. | KG | 3.480000 | $9.40 | $32.71 |
| MADERA-2 | MADERA DE PINO DE 3A. EN BARROTE DE 2" X 4" | PT | 3.280000 | $5.90 | $19.35 |
| DIESEL | DIESEL | LT | 0.120000 | $4.20 | $0.50 |
| ALAMBRE 16 MM | ALAMBRE GALVANIZADO | KG | 0.105000 | $16.95 | $1.78 |
| CLAVO | CLAVO | KG | 0.200000 | $13.50 | $2.70 |
| GALVANIZADO POR INME | KG | 3.610000 | $3.00 | $10.83 | |
| Suma de Material | $86.63 | ||||
| Mano de Obra | |||||
| CUADRILLA E-OC-02 | (1 ALBAÑIL + 1 AYUDANTE DE ALBAÑIL) | JOR | 0.062500 | $576.23 | $36.01 |
| Suma de Mano de Obra | $36.01 | ||||
| Herramienta | |||||
| ANDAMIO METALICO | HASTA UNA ALTURA DE 6.00 M | R/DIA | 0.050000 | $45.00 | $2.25 |
| Suma de Herramienta | $2.25 | ||||
| Costo Directo | $124.90 |