| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 7:04 (B) | TRINCHERA TIPO DE CONCRETO F¨=200 KG/CM2 DE 2.50 M DE LARGO X 0.30 M DE ANCHO Y 0.40 CMS DE PROFUNDIDAD PROMEDIO, CON CIMBRA APARENTE Y MALLA 6X6/4X4 GALVANIZADA. | PZA |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| MALLA 6-6 4/4 | M2 | 2.750000 | $31.00 | $85.25 | |
| GALVANIZADO DE MALLA | GALVANIZADO DE MALLA | KG | 7.780000 | $4.00 | $31.12 |
| ALAMBRE 16 MM | ALAMBRE GALVANIZADO | KG | 0.125000 | $16.95 | $2.12 |
| Suma de Material | $118.49 | ||||
| Auxiliar | |||||
| CONCRETO F-C=200 H/O | Concreto f'c=200 kg/cm2 hecho en obrare sistencia normal, agregado maximo 3/4" ( CIMIENTO ) | M3 | 0.325500 | $835.66 | $272.01 |
| Suma de Auxiliar | $272.01 | ||||
| Concepto | |||||
| 5:03(B) | CIMBRA APARENTE EN MUROS DE CONCRETO POR AMBAS CARAS, INCLUYE MATERIALES, MANO DE OBRA, CLAVOS, ALAMBRE DIESEL ETC. | M2 | 4.480000 | $125.49 | $562.20 |
| Suma de Concepto | $562.20 | ||||
| Costo Directo | $952.69 |